Wisconsin. Department of Administration: Building Project Files, 1987-2006

Container Title
2012/068
Part 3 (2012/068): Additions, 1992-2001
Physical Description: 7.0 cubic feet (7 records center cartons) 
Scope and Content Note: Records, 1992-2001, on building projects administered by the Division of Facilities Development. Projects include: the construction and subsequent expansion of Jackson Correctional Institution in Black River Falls; the renovation of the Red Gym on the University of Wisconsin-Madison campus; repair and renovation work to the Wisconsin Historical Society's Villa Louis site; the construction of the Fluno Center on the University of Wisconsin-Madison campus; infrastructure repair to the Old Main building on the University of Wisconsin-Superior campus; and the construction of the Redgranite Correctional Institution in Redgranite, Wisconsin. Records include correspondence, bid packages, environmental impact statements, meeting materials, building plans, and records on construction administration and review. Records are organized by project number. Note that additional records on the Jackson Correctional Institution project can be found in accession 2011/172.
Access Restrictions: Boxes 1-2, Box 5 (folders 13-20), and Boxes 6-7 are restricted per Wis. Stat. 101.12.
9109-93 (original project) and 91993.1 (remodeling and expansion), Jackson Correctional Institution, 1992-1995
Access Restrictions: Boxes 1-2 are restricted. See the Access Restriction note for this accession.
Box   1
Folder   1-3
Correspondence
Box   1
Folder   4-6
Planning
Box   1
Folder   7-8
Field testing
Box   1
Folder   9
Reviews
Box   2
Folder   1-3
Reviews (continued)
Box   2
Folder   4-5
Environmental impact statements
Box   2
Folder   6
Bid and award
Box   2
Folder   7
Construction bulletins
Box   2
Folder   8
Legal
Box   2
Folder   9
Gas utility
93517, Armory and Gymnasium (Red Gym) renovation, University of Wisconsin-Madison, 1995-2000
Box   2
Folder   10-16
Construction administration
Box   3
Folder   1-2
Getty grant
Box   3
Folder   3
Construction bulletins
Box   3
Folder   4
Cost sharing with Pyle Center
Box   3
Folder   5
Percent for art
Box   3
Folder   6-8
Errors and omissions/additional fees
Box   3
Folder   9
Audio/video, telecommunications
Box   3
Folder   10
Request for proposal, interior sign system
Box   3
Folder   11
Bid phase
Box   3
Folder   12
Cost estimates
Box   3
Folder   13
Responses to final review comments
Box   3
Folder   14-15
Bid packages
Box   3
Folder   16
Budget
Box   3
Folder   17
Chilled water line replacement
Box   3
Folder   18
Subsurface exploration and geotechnical evaluation
Box   3
Folder   19
Historic structure report
Box   3
Folder   20
Code variances
Box   4
Folder   1
Contract documents
Box   4
Folder   2
Preliminary design
Box   4
Folder   3
Elevator
Box   4
Folder   4
Asbestos abatement
Box   4
Folder   5
95B57, Villa Louis residence and office repair and renovation, State Historical Society, 1996
97708, Fluno Center, University of Wisconsin-Madison, 1997-2000
Box   4
Folder   6-9
Correspondence
Box   4
Folder   10-11
Bid packages
Box   5
Folder   1
Bid packages (continued)
Box   5
Folder   2-3
Environmental impact statements
Box   5
Folder   4
Geotechnical investigation
Box   5
Folder   5
Phase 2 construction proposals
Box   5
Folder   6
Development agreement
Box   5
Folder   7
City of Madison application for Plan Commission approval
Box   5
Folder   8-9
Request for qualification for construction services
Box   5
Folder   10
Water sumps
98349, Old Main building system infrastructure repair, University of Wisconsin-Superior, 1998-2001
Box   5
Folder   11
General
Box   5
Folder   12
Bid package
98597, Redgranite Correctional Institution, 1998-2000
Access Restrictions: Box 5 (Folders 13-20) and Boxes 6-7 are restricted. See the Access Restriction note for this accession.
Box   5
Folder   13-20
Correspondence
Box   6
Folder   1-5
Correspondence (continued)
Box   6
Folder   6
Department of Natural Resources stack permit
Box   6
Folder   7
Review comments
Box   6
Folder   8
Telecommunications
Box   6
Folder   9
Architectural renderings
Box   6
Folder   10
Construction contract
Box   6
Folder   11
Draft environmental impact statement
Project manual
Bid packages
Box   6
Folder   12-18
Numbers 1-2; 4a-5b
Box   7
Folder   1-6
Numbers 6-9; 11
Box   7
Folder   7
Construction drawings, architectural and structural specifications
Box   7
Folder   8
Division of Facilities Development review, specifications and structural details
Detail manual
Box   7
Folder   9
Bid package number 9 (plumbing, HVAC, fire protection, etc.)
Box   7
Folder   10
Construction drawings