|
Appendix: Consultant Reports Arranged Alphabetically by Consultant/Author
Consultant
|
Title
|
Report Date
|
Distribution Date
|
Box
|
Folder
|
|
Wisconsin Clay Deposits |
|
1984, April 17 |
2 |
7 |
|
Bedrock Permeability |
|
1984, July 30 |
2 |
14 |
|
Attenuation Characteristics of Soils in the Prospecting Program Infiltration Site for Exxon Minerals Co |
|
1984, July 30 |
2 |
15 |
|
Testimony of Exxon Witnesses before the Division of Hearings and Appeals |
|
1986, September 16 |
5 |
4-8 |
Camp Dresser |
Untitled |
|
|
5 |
15-16 |
CH2MHill |
Phase III Waster Management Study |
1982, December 30 |
1983, November 28 |
1 |
14-17 |
CH2MHill |
Water Treatment facility Final Plans and Specifications |
1986, September |
1986, November |
5 |
10-11 |
Colorado School of Mines Research Institute |
Characterization of Crandon Mill Tailings |
1982, October 12 |
|
5 |
17 |
Commodities Research Unit Limited |
Pyrite Processing Market Studies Final Report |
1979, November |
|
5 |
18 |
D'Appolonia |
Soil Attenuation Study |
1982, November |
|
6 |
3-5 |
Dames & Moore |
Hydrodynamics and Associates Chemical Species Transport Calculation Performed in Analyses of the Exxon/Crandon Infiltration Test Site |
1981, January |
1984, July 30 |
2 |
16 |
Dames & Moore |
Hydraulic Relations Between Site Area Lakes and the Main Ground Water Aquifer |
1984, September 20 |
1984, November 26 |
3 |
2 |
Dames & Moore |
Hydraulic Relations Between Little Sand, Oak, Duck, Skunk, and Deep Hole Lakes and the Main Ground Water Aquifer, Crandon Project |
1985, April 4 |
1985, April 26 |
3 |
9-10 |
Dames & Moore |
Investigation of Feasibility of Dewatering and Other Alternatives for Open Pit Mine Option, near Crandon, Wisconsin |
1977, May 20 |
|
6 |
1 |
Dames & Moore |
Results of Permeability Tests and Analyses of Water Samples from Deep Exploration Holes, Crandon Orebody |
1978, April 19 |
|
6 |
2 |
Davy McKee |
Pyrite Processing Study: Phase I (Marketing, Transportation & Process Technology), Summary, Appendix |
1979, November |
1983, November 28 |
2 |
11-13 |
Denver Research Institute (for DNR) |
Preliminary Socioeconomic Impact Analyses of Exxon's Proposed Crandon Project |
1985, July |
1985, July |
3 |
12 |
DNR |
Draft Environmental Impact Statement Exxon Minerals Company Zinc-Copper Mine, Crandon |
1986, May |
|
5 |
3 |
DNR |
Final Environmental Impact Statement Exxon Coal and Minerals Co. Zinc-Copper Mine |
|
|
5 |
14 |
Ecological Analysts, Inc. |
Chemistry and Hydrology in Swamp Creek, 1983 |
1984, April |
1984, May 21 |
2 |
8 |
Ecological Analysts, Inc. |
Water and Sediment Chemistry and Hydrology in Swamp Creek for the Crandon Project |
1983, July |
1984, May 21 |
2 |
8 |
Ecological Analysts, Inc. |
Aquatic Biology of Swamp Creek for the Crandon Project, 1983 |
1984, April |
1984, May 21 |
2 |
9 |
Exxon |
Review Air Permit Application |
1985, February |
|
3 |
5-7 |
Exxon |
Environmental Impact Report, Vol 1-4, Revised |
1985, November |
|
3 |
13-22 |
Exxon |
Environmental Impact Report, Vol 4-10 |
1985, November |
|
4 |
1-17 |
Exxon |
Wisconsin Pollutant Discharge Elimination System (WPDES), Revised |
1985, December |
|
4 |
18-19 |
Exxon |
Wisconsin Pollutant Discharge Elimination System (WPDES), Revised |
1985, December |
|
5 |
1 |
Foth & Van Dyke |
Preliminary Engineering Mine/Mill Access Road |
1982, August |
|
6 |
6-11 |
Golder Associates |
Excess Water Discharge, Crandon Project Waste Disposal System |
1981, December |
1983, November 28 |
1 |
10 |
Golder Associates |
Parametric Seepage Rate Estimates, Crandon Project Waste Disposal System Project Report 3.1 |
1982, March |
1983, November 28 |
1 |
11 |
Golder Associates |
Miscellaneous details and Analyses, Crandon Waste Disposal System, Project Report 11 |
1982, September |
1983, November 28 |
1 |
12 |
Golder Associates |
Geohydrologic Characterization, Crandon Project |
1982, October |
1983, December 5 |
1 |
18 |
Golder Associates |
Underdrain Review, Crandon Project Waste Disposal System, Project Report 3.2 |
1982, March |
1983, November 28 |
1 |
20 |
Golder Associates |
Evaluation of Prospective Common Liners, Crandon Project Waste Disposal System Project Report 6.2 |
1981, December |
1983, December 5 |
2 |
1 |
Golder Associates |
Geotechnical Review Crandon Project Waste Disposal System, Project Report 2.1 |
1981, October |
|
6 |
12-16 |
Golder Associates |
Groundwater Impact Screening Model, Crandon Project Waste Disposal System, Project Report 9 |
1982, March |
|
6 |
17 |
Golder Associates |
Groundwater Potentiometric Contours, Crandon Project Waste Disposal System, Project Report 7 |
1981, September |
|
6 |
18 |
Golder Associates |
Laboratory Testing Programs, Crandon Project Waste Disposal System, Project Report 5 |
1982, May |
|
6 |
19 |
Golder Associates |
Pump Test and Analyses, Crandon Project Waste Disposal System, Project Report 4 |
1981, September |
|
6 |
20-21 |
Golder Associates |
Pump Test Response to DNR Memorandum |
1984, October |
|
6 |
22 |
Golder Associates |
System Development, Crandon Project Waste Disposal System, Project Report 8 |
1983, January |
|
6 |
23 |
Golder Associates |
System Development, Crandon Project Waste Disposal System, Project Report 8, Continued |
1983, January |
|
7 |
1 |
Golder Associates |
Railings Pond Reclamation Cover, Crandon Project Waste Disposal System, Project Report 10 |
1982, August |
|
7 |
2 |
Hazleton Environmental Sciences |
Radiological testing Program, Crandon Project |
1981, August 10 |
1983, November 28 |
1 |
9 |
Helmke, Philip |
Review of the Mining and Milling Waste Materials and Interaction of the Railings Leachate with the Mine Waste Disposal Facility Liner and subsoils for a Zinc-Copper Mine Proposed by Exxon Corporation near Crandon, Wisconsin |
1984, December 7 |
1985, January 5 |
3 |
3 |
Indeco |
EIR Chapter 1 Construction of Waste Disposal facilities |
|
1982, September |
7 |
3 |
Inman, Foltz & Associates |
Mine Site Access road, Route Location Study For Exxon Minerals Company, USA |
1983, November 28 |
|
1 |
8 |
Interdisciplinary Environmental Planning |
Hydrological Balance for Selected Wetlands |
1982, December |
1983, November 28 |
1 |
5 |
Interdisciplinary Environmental Planning Inc. |
Supplementary Wetlands |
1983, August |
|
7 |
4-5 |
Knight and Piesold, Ltd. |
Tailings Storage Facility Report on Conceptual Design |
1982, February 19 |
1983, December 5 |
2 |
3 |
Mitchell, R.J., et al. |
Evaluation of Surface Effects, Crandon Project, Exxon Minerals Co |
1979, September 14 - 1982, April 28 |
1983, November 28 |
1 |
21 |
Normandeau Associates, Inc. |
Wetlands Assessment |
1982, August |
|
7 |
7-10 |
Overstreet & Brazeau |
Archaeological Inventory and Evaluation at Exxon Minerals Company, Crandon Project Site in Forest County and Langlade County, Wisconsin and Addendum |
1982, January-1983, June |
1983, November 28 |
1 |
6-7 |
Owen Ayers |
Waste Disposal Facility Reclamation Cap |
1982, November |
1983, November 28 |
1 |
19 |
Research and Planning Consultants |
Forecast of Future Conditions socioeconomic Assessment, Crandon Project |
1983, October |
1983, November 28 |
1 |
13 |
Rowe, Roger |
Supergene Weathering at the Crandon Deposit |
1982, April |
|
7 |
11 |
Sanborn Group, Inc. |
Site Master Plan |
1984, March 1 |
|
2 |
6 |
Schroeder, C.C. |
Tailing Ponds Water Clarification Pools |
1983, March 22 |
|
7 |
14 |
Steigerwaldt & Sons |
Forest Inventory, Timber Appraisal, and Forest Management Recommendations on 3474 acres of the Crandon Mine Project |
1982, July |
1983, November 28 |
1 |
22 |
STS Consultants |
Hydrogeologic Study Update, Crandon Project |
1984, June 26 |
1984, July 30 |
2 |
17-20 |
STS Consultants |
Laboratory Testing of Tailings |
1983, June 20 |
1985, January 30 |
3 |
4 |
STS Consultants |
Feasibility Study for Mine Refuse Disposal Facility, Crandon Project |
1985, November 26 |
|
7 |
12-13 |
Trevino, Andres (for DNR) |
Review of the Crandon Project Reports Submitted by Exxon Minerals Company Assessing Possible uses for Pyrite Tailings |
1984, December 21 |
1985, January 3 |
3 |
3 |
Voorheers, Michael L. |
Groundwater Inflow Model for the Proposed Crandon Mine |
1982, December |
1983, December 5 |
2 |
2 |
Zordan Associates |
Transportation of Reagent Materials Off-site Risk Related Issues |
1984, November |
|
7 |
15 |
|