Container
|
Title
|
Box
1
|
Manual of General Information for Wisconsin Tax Description Projects.
|
|
Box
1
|
Assessment Reference Register, Book 1 and Book 2, 1933-1936
|
|
Box
1
|
Farm Buildings, Costs of materials and building equipment installed, 1939
|
|
Box
2
|
Buildings, Residential, 1934
|
|
Box
2
|
Refrigeration and Air-conditioning, 1937-1938
|
|
Box
2
|
Milk Processing Plants, 1938, condensed, malted & powdered milk
|
|
Box
2
|
Cost Study, Labor Calculator, Tamblyn, copyrighted
|
|
Box
2
|
Perpetual Chart - Labor Efficiency, Frank Betts, 1945, Copyrighted Masonry
|
|
Box
3
|
Perpetual Cost Chart, Schlagenhauf, Building Construction Costs, W.P.A. project #9074
|
|
Box
3
|
Cost Study, Apartments, Filling Stations, Miscellaneous, 1935-1939
|
|
Box
3
|
Materials in Place, Various unit costs, 1938 - 1940
|
|
|
Cost Study
|
|
Box
3
|
Building Cost data, unit prices, May 1, 1940
|
|
Box
3
|
Equipment and Materials, Cost Book, 1941
|
|
Box
3
|
Mercantile 1-story store buildings, single store, double store, and three store units, May 1, 1937
|
|
Box
3
|
Ordinary Stores, Double Store type, 1937
|
|
Box
4
|
Ordinary Stores, Double Store type, 1937, continued
|
|
Box
4
|
Basement and heating for single, double and triple store units, May 1, 1939
|
|
Box
4
|
Single Store Building, Brick on Tile, Class 3, 1939
|
|
Box
4
|
Double Store Building, Brick on Tile, Class 3, 1939
|
|
Box
4
|
Triple Store Building, Brick on Tile, Class 3, 1939
|
|
Box
5
|
Residential Two-Family Duplex, Class 3, 1939
|
|
Box
5
|
Mercantile one-story stores; Single, Double, Triple Store Building; Class 3, 1937
|
|
Box
5
|
Factory Buildings, Construction Cost Unit, 1940 (2 folders)
|
|
Box
6
|
Refrigeration, Purpose, Types & Values
|
|
Box
6
|
Building Construction Cost (2 folders)
|
|
Box
6
|
Agricultural Buildings; Farm Barn Equipment Costs; Single & Duplex
|
|
Box
6
|
Family Frame, Class 3 (2 folders)
|
|
|
Industrial Equipment Prices
|
|
Box
6
|
Blowers - Fans
|
|
Box
6
|
Factory Equipment - Motors
|
|
Box
6
|
Power Plant - Misc.
|
|