Container
|
Title
|
2012/068
|
Part 3 (2012/068): Additions, 1992-2001 7.0 cubic feet (7 records center cartons) : Records, 1992-2001, on building projects administered by the Division of Facilities
Development. Projects include: the construction and subsequent expansion of Jackson
Correctional Institution in Black River Falls; the renovation of the Red Gym on the
University of Wisconsin-Madison campus; repair and renovation work to the Wisconsin
Historical Society's Villa Louis site; the construction of the Fluno Center on the
University of Wisconsin-Madison campus; infrastructure repair to the Old Main building
on the University of Wisconsin-Superior campus; and the construction of the Redgranite
Correctional Institution in Redgranite, Wisconsin. Records include correspondence, bid
packages, environmental impact statements, meeting materials, building plans, and
records on construction administration and review. Records are organized by project
number. Note that additional records on the Jackson Correctional Institution project can
be found in accession 2011/172. : Boxes 1-2, Box 5 (folders 13-20), and Boxes 6-7 are restricted per Wis. Stat.
101.12.
|
|
|
9109-93 (original project) and 91993.1 (remodeling and expansion), Jackson
Correctional Institution, 1992-1995 : Boxes 1-2 are restricted. See the Access Restriction note for this accession.
|
|
Box
1
Folder
1-3
|
Correspondence
|
|
Box
1
Folder
4-6
|
Planning
|
|
Box
1
Folder
7-8
|
Field testing
|
|
Box
1
Folder
9
|
Reviews
|
|
Box
2
Folder
1-3
|
Reviews (continued)
|
|
Box
2
Folder
4-5
|
Environmental impact statements
|
|
Box
2
Folder
6
|
Bid and award
|
|
Box
2
Folder
7
|
Construction bulletins
|
|
Box
2
Folder
8
|
Legal
|
|
Box
2
Folder
9
|
Gas utility
|
|
|
93517, Armory and Gymnasium (Red Gym) renovation, University of
Wisconsin-Madison, 1995-2000
|
|
Box
2
Folder
10-16
|
Construction administration
|
|
Box
3
Folder
1-2
|
Getty grant
|
|
Box
3
Folder
3
|
Construction bulletins
|
|
Box
3
Folder
4
|
Cost sharing with Pyle Center
|
|
Box
3
Folder
5
|
Percent for art
|
|
Box
3
Folder
6-8
|
Errors and omissions/additional fees
|
|
Box
3
Folder
9
|
Audio/video, telecommunications
|
|
Box
3
Folder
10
|
Request for proposal, interior sign system
|
|
Box
3
Folder
11
|
Bid phase
|
|
Box
3
Folder
12
|
Cost estimates
|
|
Box
3
Folder
13
|
Responses to final review comments
|
|
Box
3
Folder
14-15
|
Bid packages
|
|
Box
3
Folder
16
|
Budget
|
|
Box
3
Folder
17
|
Chilled water line replacement
|
|
Box
3
Folder
18
|
Subsurface exploration and geotechnical evaluation
|
|
Box
3
Folder
19
|
Historic structure report
|
|
Box
3
Folder
20
|
Code variances
|
|
Box
4
Folder
1
|
Contract documents
|
|
Box
4
Folder
2
|
Preliminary design
|
|
Box
4
Folder
3
|
Elevator
|
|
Box
4
Folder
4
|
Asbestos abatement
|
|
Box
4
Folder
5
|
95B57, Villa Louis residence and office repair and renovation, State
Historical Society, 1996
|
|
|
97708, Fluno Center, University of Wisconsin-Madison,
1997-2000
|
|
Box
4
Folder
6-9
|
Correspondence
|
|
Box
4
Folder
10-11
|
Bid packages
|
|
Box
5
Folder
1
|
Bid packages (continued)
|
|
Box
5
Folder
2-3
|
Environmental impact statements
|
|
Box
5
Folder
4
|
Geotechnical investigation
|
|
Box
5
Folder
5
|
Phase 2 construction proposals
|
|
Box
5
Folder
6
|
Development agreement
|
|
Box
5
Folder
7
|
City of Madison application for Plan Commission approval
|
|
Box
5
Folder
8-9
|
Request for qualification for construction services
|
|
Box
5
Folder
10
|
Water sumps
|
|
|
98349, Old Main building system infrastructure repair, University of
Wisconsin-Superior, 1998-2001
|
|
Box
5
Folder
11
|
General
|
|
Box
5
Folder
12
|
Bid package
|
|
|
98597, Redgranite Correctional Institution,
1998-2000 : Box 5 (Folders 13-20) and Boxes 6-7 are restricted. See the Access Restriction note
for this accession.
|
|
Box
5
Folder
13-20
|
Correspondence
|
|
Box
6
Folder
1-5
|
Correspondence (continued)
|
|
Box
6
Folder
6
|
Department of Natural Resources stack permit
|
|
Box
6
Folder
7
|
Review comments
|
|
Box
6
Folder
8
|
Telecommunications
|
|
Box
6
Folder
9
|
Architectural renderings
|
|
Box
6
Folder
10
|
Construction contract
|
|
Box
6
Folder
11
|
Draft environmental impact statement
|
|
|
Project manual
|
|
|
Bid packages
|
|
Box
6
Folder
12-18
|
Numbers 1-2; 4a-5b
|
|
Box
7
Folder
1-6
|
Numbers 6-9; 11
|
|
Box
7
Folder
7
|
Construction drawings, architectural and structural
specifications
|
|
Box
7
Folder
8
|
Division of Facilities Development review, specifications and structural
details
|
|
|
Detail manual
|
|
Box
7
Folder
9
|
Bid package number 9 (plumbing, HVAC, fire protection, etc.)
|
|
Box
7
Folder
10
|
Construction drawings
|
|