Item Number
|
Description
|
Item 1 |
Cover letter to Lynda Dorr of the Public Service Commission by Larry Salustro
of Wisconsin Energy Corporation with the Application of Wisconsin Energy Corporation
Companies for Certificates of Public Convenience and Necessity and Other Related
Authorizations and Approvals, 2002 January 31 (Volumes 1-3) |
Item 2 |
Cover letter to Richard Grigg, Gerald Abood and Wisconsin Electric Power
Company by Freddi L. Greenburg of Midwest Independent Power Suppliers regarding a
Trust Agreement, 2002 February 1 |
Item 3 |
Cover letter to the Service List by Lynda Dorr of the Public Service Commission
of Wisconsin with Notice of Proceeding, Assessment of Costs and Prehearing
Conference, 2002 February 21 |
Item 4 |
Confidential Material No. 19291 subsequently made public: Archeological and
cultural information about Elm Road site |
Item 5 |
Cover letter to David C. Whitcomb of the Public Service Commission of Wisconsin
by Michael Vickerman of Renew Wisconsin and request for Full/Interested Party
Intervention, 2002 March 5 |
Item 6 |
Minutes and Informal Instructions of the Open Meeting, 2002 March 6 |
Item 7 |
Cover letter to David Whitcomb of the Public Service Commission of Wisconsin by
Warren Day of Wisconsin Federation of Cooperatives requesting full party status,
2002 March 6 |
Item 8 |
Motion to Dismiss ERGS Application for Lack of Jurisdiction and Memorandum in
support of Motion filed by Robert H. Owen Jr., 2002 March 5 |
Item 9 |
Cover letter to David C. Whitcomb of the Public Service Commission of Wisconsin
by Catherine J. Furay with Midwest Independent Power Suppliers Inc.'s NFP for full
party status, 2002 March 7 |
Item 10 |
Cover letter to Roman Draba of Wisconsin Electric Power Company by David C.
Whitcomb of the Public Service Commission of Wisconsin with the confidentiality
determination for Confidentiality Request No. 19270, 2002 April 5 |
Item 11 |
Cover letter to Jeffery Knitter of Wisconsin Electric Power Company by David C.
Whitcomb of the Public Service Commission of Wisconsin with the confidentiality
determination for Confidentiality Request Nos. 19997 and 20000, 2002 April 5 |
Item 12 |
Power The Future Supplement 1, 2003 April 5 |
Item 13 |
Cover letter to the Service List by Lynda Dorr of the Public Service Commission
of Wisconsin with an Order issued by the Public Service Commission, 2002 April
11 |
Item 14 |
Cover letter to Douglas Wetgers of Wisconsin Electric Power Company by David C.
Whitcomb of the Public Service Commission of Wisconsin with the confidentiality
determination for Confidentiality Request No. 19268, 2002 April 15 |
Item 15 |
Cover letter to David Lee of Wisconsin Electric Power Company by David C.
Whitcomb of the Public Service Commission of Wisconsin with the confidentiality
determination for Confidentiality Request No. 19275, 2002 April 15 |
Item 16 |
Cover letter to David Lee of Wisconsin Electric Power Company by David C.
Whitcomb of the Public Service Commission with the confidentiality determination for
Confidentiality Request No. 19291, 2002 April 16 |
Item 17 |
Cover letter to Tim Jones of the Public Service Commission of Wisconsin by
Roman A. Draba of WE Energies regarding changes to the original lease for Elm Road,
2002 April 17 |
Item 18 |
Public Service Commission Order, 2002 April 19 |
Item 19 |
Cover letter to the Service List by David C. Whitcomb of the Public Service
Commission of Wisconsin dated April 25, 2002, setting out the phases of the original
Order, 2002 April 19 |
Item 20 |
Cover letter to Timothy Berrigan of Mirant Americas Development Inc. by David
C. Whitcomb of the Public Service Commission of Wisconsin with the confidentiality
determination for Confidentiality Request No. 23580, 2002 May 7 |
Item 21 |
Cover letter to Gregory Kelly of PG&E National Energy Group by David C.
Whitcomb of the Public Service Commission of Wisconsin with the confidentiality
determination for Confidentiality Request No. 19518, 2002 May 7 |
Item 22 |
Cover letter to Al Mihm of Wisconsin Electric Power Company by David C.
Whitcomb of the Public Service Commission of Wisconsin with the confidentiality
determination for Confidentiality Request No. 19294, 2002 May 9 |
Item 23 |
Final Tentative Service List, 2002 May 17 |
Item 24 |
Cover letter to the Service List by David C. Whitcomb of the Public Service
Commission of Wisconsin with the transcript of the May 6, 2002, second prehearing
conference, 2002 May 21 |
Item 25 |
Cover letter to Peter Gardon by David C. Whitcomb of the Public Service
Commission of Wisconsin with the confidentiality determination for Confidentiality
Request No. 23037, 2002 May 21 |
Item 26 |
Cover letter to Service List by David Whitcomb of the Public Service Commission
of Wisconsin with filing deadline for Replies to Exception, 2002 June 3 |
Item 27 |
Power The Future Supplement 2, 2003 June 3 |
Item 28 |
Cover letter to Gordon Grant of the Public Service Commission of Wisconsin by
Michael A. Dodge along with the City of Oak Creek's application for intervenor
compensation, 2002 June 6 |
Item 29 |
Cover letter to Timothy Jones of the Public Service Commission of Wisconsin by
Mark A. Osten regarding deficiencies in the submittals of applications, 2002 June
20 |
Item 30 |
Cover letter to Lynda Dorr of the Public Service Commission of Wisconsin by
Carl A. Sinderbrand and the Notice of Additional Appearance on behalf of S.C.
Johnson & Son Inc., 2002 June 20 |
Item 31 |
Cover letter to Mark Osten of RMT by Timothy Jones of the Public Service
Commission of Wisconsin regarding RMT's review of the Certificate of Public
Convenience and Necessity application, 2002 June 27 |
Item 32 |
Cover letter to Timothy Jones of the Public Service Commission of Wisconsin by
Lauren Hambrook of the Department of Natural Resources regarding its review of the
environmental aspects of the Wisconsin Electric Power the Future - Elm Road CPCN
Application and June 3 Supplemental Submittal, 2002 June 27 |
Item 33 |
Cover letter to Lynda Dorr and Timothy Jones of the Public Service Commission
of Wisconsin by Carl Sinderbrand with comments of S.C. Johnson & Son Inc., with
respect to completeness of CPCN application, 2002 July 1 |
Item 34 |
Cover letter to Larry Salustro of Wisconsin Energy Corporation by Robert
Norcross of the Public Service Commission of Wisconsin finding application
incomplete, 2002 July 3 |
Item 35 |
Cover letter to Carl Sinderbrand by Timothy Jones of the Public Service
Commission of Wisconsin attaching the completeness determination letter, 2002 July
3 |
Item 36 |
Cover letter to Randy Vanaartsen of Wisconsin Electric Power Company by David
C. Whitcomb of the Public Service Commission of Wisconsin with the confidentiality
determination for Confidentiality Request No. 23715, 2002 July 18 |
Item 37 |
Cover letter to Randy Vanaartsen of Wisconsin Electric Power Company by David
C. Whitcomb of the Public Service Commission of Wisconsin with the confidentiality
determination for Confidentiality Request No. 23716, 2002 July 18 |
Item 38 |
Cover letter to Larry Salustro of Wisconsin Energy Corporation by Robert
Norcross of the Public Service Commission of Wisconsin stating incompleteness of
application, 2002 August 14 |
Item 39 |
Cover letter to Raj Vakharia of the Wisconsin Department of Natural Resources
by Terry Coughlin of WE Energies with additional information for application, 2002
August 26 |
Item 40 |
Cover letter to the Service List by Lynda Dorr of the Public Service Commission
of Wisconsin with a Public Service Commission Order, 2002 September 3 |
Item 41 |
Power the Future Supplement 3, 2002 September 6 |
Item 42 |
Cover letter to Lynda Dorr of the Public Service Commission of Wisconsin by
William H. Wilson Jr. with Motion to Intervene on behalf of LS Power Associates,
L.P., 2002 September 13 |
Item 43 |
Cover letter to Lynda Dorr and Timothy Jones of the Public Service Commission
of Wisconsin by Carl Sinderbrand with S.C. Johnson & Son Inc.'s comments on the
completeness of the CPCN application as amended in Supplement 3, 2002 September
26 |
Item 44 |
Cover letter to Jeffery Kitsembel of the Public Service Commission of Wisconsin
by Mark A. Osten and David F. Seitz of RMT with a list of deficiencies of the CPCN
application, 2002 September 27 |
Item 45 |
Cover letter to Lynda Dorr and Timothy Jones of the Public Service Commission
of Wisconsin by Frank Jablonski on behalf of the Town of Caledonia regarding matters
for consideration for incompleteness, 2002 September 27 |
Item 46 |
Cover letter to Larry Salustro of Wisconsin Energy Corporation by Robert
Norcross of the Public Service Commission of Wisconsin regarding completeness of
application needed before hearing, 2002 October 7 |
Item 47 |
Power The Future Supplement 4, 2002 October 22 |
Item 48 |
Cover letter to Lynda Dorr and Jeffery Kitsembel of the Public Service
Commission of Wisconsin by Carl Sinderbrand with S.C. Johnson & Son Inc.'s
comments on the completeness of the CPCN application as amended in Supplement 4,
2002 November 6 |
Item 49 |
Cover letter to Jeffery Kitsembel of the Public Service Commission of Wisconsin
by Mark A. Osten and David F. Seitz of RMT on behalf of the City of Oak Creek with
concerns about PTF's Supplement 4, 2002 November 27 |
Item 50 |
Cover letter to residents and land owners by Jeffrey Kitsembel of the Public
Service Commission of Wisconsin describing the Elm Road Generating Station, 2003
January 13 |
Item 51 |
Cover letter to Lynda Dorr of the Public Service Commission of Wisconsin by
Carl Sinderbrand with a Petition for Interim Determination, 2003 January 14 |
Item 52 |
Cover letter to the Service List by David C. Whitcomb of the Public Service
Commission of Wisconsin setting deadline to respond to S.C. Johnson & Son,
Inc.'s and Wisconsin's Environmental Decade requests to review completeness, 2003
January 22 |
Item 53 |
Oak Creek Power Plant and Proposed Elm Road Station's Cooling Water Intake and
Lake Monitoring Study from WE Energies, 2003 February |
Item 54 |
Cover letter to David C. Whitcomb of the Public Service Commission of Wisconsin
by Dennis M. Grzezinski on behalf of the Sierra Club asking the Public Service
Commission to determine application incomplete, 2003 February 7 |
Item 55 |
Cover letter to Lynda Dorr of the Public Service Commission of Wisconsin by
Larry Martin with Applicants' Comments on Petition of S. C. Johnson & Son Inc.,
and Wisconsin's Environmental Decade Inc. for Review of Interim Determination, 2003
February 11 |
Item 56 |
Cover letter to Lynda Dorr and David C. Whitcomb of the Public Service
Commission of Wisconsin by Susan Greenfield, Chairman of Town of Caledonia Town
Board supporting petition filed by S.C. Johnson and Son Inc., 2003 February
11 |
Item 57 |
Cover letter to Lynda Dorr of the Public Service Commission of Wisconsin by
Daniel P. Gustafson on behalf of MG&E with its comments on the Petition for
Review of Interim Determination, 2003 February 12 |
Item 58 |
Cover letter to Lynda Dorr of the Public Service Commission of Wisconsin by
Michael A. Dodge on behalf of the City of Oak Creek with its Response in Support of
Petition for Review, 2003 February 12 |
Item 59 |
Cover letter to Lynda Dorr of the Public Service Commission of Wisconsin by
Elizabeth Hartman of Wisconsin Public Power Inc. with its comments on the Petition
for Review of Interim Determination filed by S.C. Johnson & Son Inc. and
Wisconsin's Environmental Decade Inc., 2003 February 12 |
Item 60 |
Cover letter to Lynda Dorr of the Public Service Commission of Wisconsin by
Carl A. Sinderbrand on behalf of S.C. Johnson & Son Inc., with additional
information pertinent to the Petition for Review of Interim Determination, 2003
February 14 |
Item 61 |
Cover letter to the Service List by Lynda Dorr of the Public Service Commission
of Wisconsin with a Notice of Prehearing Conference, 2003 February 20 |
Item 62 |
Memo to the Commission from the Public Service Commission of Wisconsin Electric
Division, 2003 February 21 |
Item 63 |
Cover letter to Lynda Dorr of the Public Service Commission of Wisconsin by
Peter L. Gardon on behalf of Calpine Corporation with a request to remove the first
two pages of their February 19, 2003, proposal as an alternative the coal plants in
Oak Creek identified by WEPCO as part of the PTF-2 proceeding to not be confidential
material, 2003 February 24 |
Item 64 |
Cover letter to Lynda Dorr of the Public Service Commission of Wisconsin by
Steve Bulik on behalf of the Citizens for Responsible Power with its request for
intervenor compensation, 2003 February 26 |
Item 65 |
Cover letter to the Service List by Jeffrey Kitsembel of the Public Service
Commission of Wisconsin with the Coastal Analysis, Sediment Transport and Regional
Impacts - Elm Road Generating Station and the Cooling Water Intake and Lake
Monitoring studies, 2003 February 27 |
Item 66 |
Cover letter to David C. Whitcomb of the Public Service Commission by Mark W.
Luberda on Behalf of the Town of Caledonia stating it intends to remain a full
party, 2003 March 3 |
Item 67 |
Cover letter to Larry Salustro of Wisconsin Energy Corporation by Robert
Norcross of the Public Service Commission of Wisconsin stating incompleteness of the
application of Wisconsin Energy Corporation, 2003 March 4 |
Item 68 |
Cover letter to David C. Whitcomb of the Public Service Commission of Wisconsin
by Steven J. Books asking to be a full party to identify issues at the March 7,
2003, Prehearing Conference, 2003 March 4 |
Item 69 |
Motion to Intervene of LS Power Associates by William H. Wilson Jr., 2003 March
5 |
Item 70 |
Cover letter to David C. Whitcomb of the Public Service Commission of Wisconsin
by Craig Oliver Sr., requesting full party status, 2003 March 11 |
Item 71 |
Cover letter to David C. Whitcomb of the Public Service Commission by David
Poklinkoski of Local Union No. 2304 stating it is unable to participate fully, 2003
March 20 |
Item 72 |
Cover letter to Lynda Dorr and Gordon Grant of the Public Service Commission of
Wisconsin by Eric Uram on behalf of Sierra Club's Southeast Gateway Group with its
request for Intervenor Compensation, 2003 March 24 |
Item 73 |
Cover letter to Lynda Dorr of the Public Service Commission of Wisconsin by
Pamela McGillivray on behalf of Wisconsin's Environmental Decade with its
Application for Intervenor Compensation, 2003 March 24 |
Item 74 |
Cover letter to the Service List by David C. Whitcomb of the Public Service
Commission of Wisconsin with transcripts of the March 7, 2003, Prehearing Conference
and laying out a prefiling schedule for written testimony, 2003 April 11 |
Item 75 |
Memorandum to the Commission from the Public Service Commission of Wisconsin
Electric Division regarding requests for Intervenor Compensation, 2003 April
16 |
Item 76 |
Cover letter to the Service List by Lynda Dorr of the Public Service Commission
of Wisconsin with the Order Denying Petition to Review Interim Determination, 2003
April 17 |
Item 77 |
Draft Environmental Impact Statement, Elm Road Generating Station (Volumes 1
and 2) of the Public Service Commission of Wisconsin and the Wisconsin Department of
Natural Resources, 2003 April |
Item 78 |
Minutes and Informal Instructions of the Open Meeting, 2003 May 1 |
Item 79 |
Cover letter to Craig Oliver Sr. by David C. Whitcomb of the Public Service
Commission of Wisconsin adding Craig Oliver Sr., to the Service List, 2003 May
7 |
Item 80 |
Cover letter to Lynda Dorr of the Public Service Commission of Wisconsin by
Pamela McGillivray with Clean Wisconsin's Motion for Reconsideration of the
Commission's Decision Denying in Part Clean Wisconsin's Phase 2 Application for
Intervenor Compensation, 2003 May 9 |
Item 81 |
Cover letter to the Service List by Lynda Dorr of the Public Service Commission
of Wisconsin with the May 16, 2003, Order, 2003 May 15 |
Item 82 |
Cover letter to Lynda Dorr of the Public Service Commission of Wisconsin by
John Casey with Applicants' Objection to Scope of S.C. Johnson & Son Inc.'s 2nd
and 3rd set of Data Requests, 2003 June 4 |
Item 83 |
Cover letter to Lynda Dorr of the Public Service Commission of Wisconsin by
Robert L. Kufrin of Oak Creek with a Development Agreement, 2003 June 4 |
Item 84 |
Cover letter to the Service List by David C. Whitcomb of the Public Service
Commission of Wisconsin with Administrative Law Judge's Scheduling Order, 2003 June
6 |
Item 85 |
Cover letter to Jeff Kitsembel of the Public Service Commission of Wisconsin by
Robert Kufrin of Oak Creek with Comments on the Draft Environmental Impact
Statement, 2003 June 10 |
Item 86 |
Cover letter to David C. Whitcomb of the Public Service Commission by Larry
Martin with objections to Phase II, 2003 June 11 |
Item 87 |
Cover letter to Jeffery Kitsembel of the Public Service Commission of Wisconsin
by Susan Greenfield of the Town of Caledonia with its comments on the Draft
Environmental Impact Statement, 2003 June 11 |
Item 88 |
Cover letter to Jeffery Kitsembel of the Public Service Commission of Wisconsin
from the Wisconsin Legislature with comments on the Draft Environmental Impact
Statement, 2003 June 11 |
Item 89 |
Cover letter to Jeffery Kitsembel of the Public Service Commission of Wisconsin
by James Childress of Gasification Technologies Council with comments on the Draft
Environmental Impact Statement, 2003 June 11 |
Item 90 |
Cover letter to Raj Vakharia of the Wisconsin Department of Natural Resources
by Terry Coughlin of WE Energies with an Air Quality Assessment, 2003 June
11 |
Item 91 |
Official Filing in response to Administrative Law Judge David Whitcomb's new
Rescheduling Order by Dan L. Sanford of American Transmission Company stating no
objections, 2003 June 12 |
Item 92 |
Official filing from Carl A. Sinderbrand on behalf of S.C. Johnson & Son,
Inc. with no objections to rescheduling order, but an objection to location of the
technical hearing location, 2003 June 12 |
Item 93 |
Cover letter to Jeffery Kitsembel of the Public Service Commission of Wisconsin
of Christopher D. Young on behalf of ANR Pipeline with comments to correct a false
impression in the Draft Environmental Impact Statement, 2003 June 12 |
Item 94 |
Comments of the Citizens Utility Board on the Draft Environmental Impact
Statement, submitted by George Edgar, 2003 June 12 |
Item 95 |
Cover letter to Jeffery Kitsembel of the Public Service Commission of Wisconsin
by John Thompson on behalf of the Clean Air Task Force with comments on the Draft
Environmental Impact Statement, 2003 June 12 |
Item 96 |
Comments of S.C. Johnson & Son Inc. on the Draft Environmental Impact
Statement for the Elm Road Generating Station, 2003 June 12 |
Item 97 |
Cover letter to Lynda Dorr of the Public Service Commission of Wisconsin by
Michael Stuart on behalf of Wisconsin Public Power with comments on the Draft
Environmental Impact Statement, 2003 June 13 |
Item 98 |
Cover letter to Lynda Dorr of the Public Service Commission of Wisconsin by
Peter L. Gardon on behalf of Calpine Corporation with comments on the Draft
Environmental Impact Statement, 2003 June 13 |
Item 99 |
Comments of David Jenkins of Wisconsin Electric Cooperative Association on the
Draft Environmental Impact Statement, 2003 June 13 |
Item 100 |
Comments of the Lake Michigan Federation on the Draft Environmental Impact
Statement, 2003 June 13 |
Item 101 |
Cover letter to Jeffery Kitsembel of the Public Service Commission of Wisconsin
by R.A. Draba of WE Energies with comments on the Draft Environmental Impact
Statement, 2003 June 13 |
Item 102 |
Cover letter to Jeffery Kitsembel of the Public Service Commission of Wisconsin
by Pamela McGillivray on behalf of Clean Wisconsin with their comments on the Draft
Environmental Impact Statement, 2003 June 13 |
Item 103 |
Cover letter to the Service List by David C. Whitcomb of the Public Service
Commission of Wisconsin with Rescheduling Order, 2003 June 17 |
Item 104 |
Memorandum to the Commission from the Public Service Commission of Wisconsin
Electric Division with a suggested minute denying Citizens for Responsible Power to
reconsider portions of its decision petition, 2003 June 18 |
Item 105 |
Cover letter to Lynda Dorr of the Public Service Commission of Wisconsin by
Peter L. Gardon on behalf of Calpine Corporation with certain correspondence,
Confidential Revised Proposal, confidentiality request form and affidavit, 2003 June
20 |
Item 106 |
Cover Letter to the Service List by Lynda Dorr of the Public Service Commission
of Wisconsin with the Final Order, 2003 June 27 |
Item 107 |
Cover letter to the Service List by Lynda Dorr of the Public Service Commission
of Wisconsin with the Final Order, 2003 July 2 |
Item 108 |
Cover letter to David C. Whitcomb of the Public Service Commission of Wisconsin
by Robert Owen with a Notice of Motion to Dismiss (Strike) ERGS3 IGCC Portion of Elm
Road Generating Station Application, 2003 July 3 |
Item 109 |
Cover letter to the Service List by Lynda Dorr of the Public Service Commission
of Wisconsin with a Notice of Scheduling Conference, 2003 July 16 |
Item 110 |
Cover letter to the Public Service Commission of Wisconsin by Robert Owen with
a Brief of Robert H. Owen Jr. in Support of Motion to Dismiss (Strike) ERGS3 IGCC
Portion of Elm Road Generating Station Application, 2003 July 17 |
Item 111 |
Cover letter to Lynda Dorr and Gordon Grant of the Public Service Commission of
Wisconsin by Eric Uram on behalf of Sierra Club's Southeast Gateway Group with its
request for Intervenor Compensation, 2003 July 24 |
Item 112 |
Cover letter to David C. Whitcomb of the Public Service Commission of Wisconsin
by Larry Martin on behalf of Wisconsin Energy Corporation, in response to Robert
Owens's Motion, 2003 July 22 |
Item 113 |
Cover letter to the Service List by David C. Whitcomb of the Public Service
Commission of Wisconsin with a Rescheduling Order, 2003 July 23 |
Item 114 |
Public Service Commission of Wisconsin Notice of Hearing, 2003 July 25 |
Item 115 |
Cover letter to David C. Whitcomb of the Public Service Commission of Wisconsin
by Carl Sinderbrand with a Motion to Compel Response to Data Requests and for
Expedited Response and Decision, 2003 July 29 |
Item 116 |
Cover letter to David C. Whitcomb of the Public Service Commission of Wisconsin
by Robert H. Owen Jr., with a Motion to Dismiss (Strike) ERGS 1 and 2 Portions and
Entirety of Elm Road Generating Station Application and Brief of Robert H. Owen,
Jr., in Support of Motion to Dismiss ERGS Application, 2003 July 31 |
Item 117 |
Cover letter to the Service List by David C. Whitcomb of the Public Service
Commission of Wisconsin with an Order by the Commission, 2003 July 31 |
Item 118 |
Cover letter to David C. Whitcomb of the Public Service Commission of Wisconsin
by John Casey with Applicants' responses to the S.C. Johnson data requests
identified by Mr. Sinderbrand in the Motion to Compel, 2003 July 31 |
Item 119 |
Final Environmental Impact Statement, Elm Road Generating Station, Volumes 1 to
3, of the Public Service Commission of Wisconsin and the Wisconsin Department of
Natural Resources. (NB: Introduced at Public Service Commission of Wisconsin
hearings as Exhibit 274.) |
Item 120 |
Cover letter to David C. Whitcomb of the Public Service Commission of Wisconsin
by John Casey in response to S.C. Johnson & Son Inc.'s Motion to Compel, 2003
August 1 |
Item 121 |
Cover letter to David C. Whitcomb of the Public Service Commission of Wisconsin
by Larry Martin with Applicants' Response to Robert Owen's Motion to Dismiss, 2003
August 7 |
Item 122 |
Cover letter to the Service List by David C. Whitcomb of the Public Service
Commission of Wisconsin with the Order on the Motion to Dismiss, 2003 August
13 |
Item 123 |
Cover letter to David C. Whitcomb of the Public Service Commission of Wisconsin
by Larry Martin clarifying an Exhibit, 2003 August 18 |
Item 124 |
Cover letter to David C. Whitcomb of the Public Service Commission of Wisconsin
by Larry Martin regarding availability of witnesses, 2003 August 19 |
Item 125 |
Cover letter to the Service List by David C. Whitcomb of the Public Service
Commission of Wisconsin with a Scheduling Order for Submission of Written Testimony
by members of the Public, 2003 August 19 |
Item 126 |
Minutes and Informal Instructions of the Open Meeting of Wednesday, 2003 August
20 |
Item 127 |
Cover letter to Lynda Dorr of the Public Service Commission of Wisconsin by
Tony Hemming of ChevronTexaco with a Motion for Leave to Intervene out of Time of
ChevronTexaco Worldwide Power and Gasification Inc., and the Direct Testimony of
Alma I. Rodarte, Ph.D., on Behalf of ChevronTexaco Worldwide Power and Gasification,
Inc. on the Draft Environmental Impact Statement, 2003 August 26 |
Item 128 |
Cover letter to David C. Whitcomb of the Public Service Commission of Wisconsin
by David Ludwig of the Public Service Commission of Wisconsin with the Commission
staff's response to the Motion of ChevronTexaco, 2003 August 29 |
Item 129 |
Cover letter to Lynda Dorr of the Public Service Commission of Wisconsin by
John Raihala with the Notice of Appearance on behalf of ChevronTexaco Worldwide
Power and Gasification Inc., 2003 August 29 |
Item 130 |
Cover letter to Heidi Hopkins of Wisconsin Department of Natural Resources by
David M. Lee of WE Energies with proof of publications, 2003 September 5 |
Item 131 |
Order of the Administrative Law Judge ordering Transcript Volume 3 (pp.
839-860) and Volume 4 (pp. 861-872; 912-913), 2003 September 5 |
Item 132 |
Order of the Administrative Law Judge ordering Transcript Volume 6 (pp.
1381-1496) and Volume 8 (pp. 1890-1918) confidential, 2003 September 9 |
Item 133 |
Cover letter to the Service List by David C. Whitcomb of the Public Service
Commission of Wisconsin with the July 22, 2003, Scheduling Conference transcript,
2003 September 9 |
Item 134 |
Order of the Administrative Law Judge ordering Transcript Volume 11 (pp.
2803-2924; 3132; 3423-3465) confidential, 2003 September 11 |
Item 135 |
Order of the Administrative Law Judge ordering Transcript Volume 15 (pp.
4544-4571; 4653-4679) confidential, 2003 September 15 |
Item 136 |
Cover letter to the Service List by David C. Whitcomb of the Public Service
Commission of Wisconsin with the transcript of the September 12, 2003, hearing and
setting out a briefing schedule, 2003 September 16 |
Item 137 |
Cover letter to the Public Service Commission of Wisconsin of June Ihlenfeldt
requesting intervenorship, 2003 September 19 |
Item 138 |
Cover letter to the Service List by David C. Whitcomb of the Public Service
Commission of Wisconsin with Senator Stepp's August 26, 2003, letter to Chairperson
Bridge, 2003 September 22 |
Item 139 |
Cover letter to the Service List by David C. Whitcomb of the Public Service
Commission of Wisconsin with the list of appearances from September 17 through 19,
2003, hearings, 2003 September 24 |
Item 140 |
Cover letter to the Service List by David C. Whitcomb of the Public Service
Commission of Wisconsin with the September 11, 2003, letter from Edward J. Zore,
President and Chief Executive Officer of Northwest Mutual to Chairperson Bridge,
2003 September 29 |
Item 141 |
Cover letter to June Ihlenfeldt by David C. Whitcomb of the Public Service
Commission of Wisconsin responding to her September 19, 2003, letter, 2003 September
30 |
Item 142 |
Cover letter of Robert Owen in response to September 29, 2003, letter of David
C. Whitcomb of the Public Service Commission of Wisconsin, 2003 October 3 |
Item 143 |
Cover letter of Pamela McGillivray with Clean Wisconsin's Supplemental
Application for Intervenor Compensation for Phase II, 2003 October 6 |
Item 144 |
Cover letter of John A. Casey in response to Robert Owen's October 3, 2003,
letter, 2003 October 7 |
Item 145 |
Cover letter of Steven Bulik on behalf of Citizens for Responsible Power
requesting supplemental Intervenor Compensation funds, 2003 October 20 |
Item 146 |
Cover letter of June Ihlenfeldt withdrawing her petition, 2003 October
20 |
Item 147 |
Cover letter of David C. Whitcomb of the Public Service Commission of Wisconsin
with inventory of Public Testimony, 2003 October 23 |
Item 148 |
Cover letter by Robert Owen with a Request to Supplement Truncated Wis. Stat.
§§ 1.11 and 1.12 Analysis to Apply to All Prospective Co-owners of ERGS 1
and ERGS 2, 2003 November 6 |
Item 149 |
Minutes and Informal Instruction of the Open Meeting, 2003 November 10 |
Item 150 |
Public Service Commission of Wisconsin's Final Order, 2003 November 10 |
Item 151 |
Cover letter to Lynda Dorr of the Public Service Commission of Wisconsin by
Larry J. Martin with his response to Mr. Owen's Request to Supplement Truncated Wis.
Stat. §§ 1.11 and 1.12 Analyses to Apply to All Prospective Co-owners of
ERGS 1 and ERGS 2, 2003 November 11 |
Item 152 |
Cover letter to Lynda Dorr of the Public Service Commission of Wisconsin by
Elizabeth Hartman with her response to Mr. Owen's Request to Supplement Truncated
Wis. Stat. §§ 1.11 and 1.12 Analyses to Apply to All Prospective Co-owners
of ERGS 1 and ERGS 2, 2003 November 14 |
Item 153 |
Cover letter to Lynda Dorr of the Public Service Commission of Wisconsin by
Daniel Gustafson with his response to Mr. Owen's Request to Supplement Truncated
Wis. Stat. §§ 1.11 and 1.12 Analyses to Apply to All Prospective Co-owners
of ERGS 1 and ERGS 2, 2003 November 17 |
Item 154 |
Cover letter to the Service List by Lynda Dorr of the Public Service Commission
of Wisconsin with an Order, 2003 November 19 |
Item 155 |
Minutes and Informal Instructions of the Open Meeting, 2003 November 21 |
Item 156 |
Cover letter to the Service List by Lynda Dorr of the Public Service Commission
of Wisconsin with an Order, 2003 December 1 |
Item 157 |
Public Transcripts, Volumes 1, 2, 4, 5, 7, 9, 10, 12-14, 16-21 |
Item 158 |
Public Exhibits 1 through 302. Not including any confidential filings and Final
Environmental Impact Statement. The Final Environmental Impact Statement is listed
separately as Record Item 117 |
Item 159 |
Confidential Transcripts, Volumes 3, 6, 8, 11, 15 |
Item 160 |
Confidential Exhibits Nos. 43, 91, 93, 94, 95, 97, 110, 111, 177, 201c, 202c,
267, 269, 270, 272 |
Item 161 |
Certifications concerning review of the record signed by Commissioner Bridge,
Commissioner Bie and Commissioner Garvin |