Page View
Wisconsin Rural Electric Cooperative Association / First yearbook, 1938
(1938)
Murray, V. M.
Our engineering department, pp. 25-30
PDF (1.7 MB)
Page 29
WISCONSIN RuRAL ELECTRIC COOPERATIVE ASSOCIATION Substation of the Columbia Rural Electric Cooperative. A view of the Buffalo project. Two phase double dead end construction.-Rock project. Three phase river erowing. Trempealeau project. A 29
This material may be protected by copyright law (e.g., Title 17, US Code).| For information on re-use, see http://digital.library.wisc.edu/1711.dl/Copyright