pike & to do a filling for approchment to
bridge according to contract for the sum of
$40.00. To Fr Knetter to straighten creek
for the sum of $2.00. To Charlie Wenzel to
do a filling and build a bridge according to
contract for the sum of $29.00.
It was agreed and settled with Anton
Henke occupant of the SW1/4 of SW14 of
Sec 24, T 28, R 5 E for right of way for
highway on W side of above described land
for the sum of $15.00 (release signed)
It was agreed and settled with Martin
Calimika occupant of the SE1!4 of SE1/4 of
Sec 23, T28, R5E for right of way for high-
way on E side of the above described land
for the sum of $15.00 (release signed)
Job let to A Henke aned Calimika to
ditch about 10 rods and make a track 1/4
mile between their land for $20.00 (each
$10.00) according to the order of the board.
Job let to Mathias Wagner to build a
bridge across a creek in on said Mathias
Wagner's road in Sec 14 for the sum of
$34.00, to be paid for off taxes of 1897.
June 16, 1897 - It is hereby agreed
and understood between the Town of
Cassel and Mathias Wagner of said town
that a certain strip of land 1 and 80/100
acres situated on the line between the
NW14 and the NE1/4 of the NE1/4 of Sec
14 in said Town of Cassel has hereby been
leased to the Town of Cassel for a public
highway for 99 years for all reasons what-
soever for the sum of $1.00 to him in kind
paid.
September 20, 1897 - A road com-
mencing at the SW corner of Sec 10
running straight N on line between Sec 9
& 10 in said Town of Cassel, said highway
being laid out to the width of 3 rods and
riteway settled for as follows:
To St Wadinski for W side of Sec SW
SW Sec 10 - $5.00
To Ron Wadinski for W side of NW SW
of Sec 10 - $5.00
Awarded for W side of NW1/4 - 1/2 mile
- $2.00
Settled with John Seubert on E side of
Sec 9 - 1 mile - $1.00
A road commencing at the NW corner
of Sec 15, T28, R5E running straight W
1/2 mile on line between Sec 9 & 16 to
1/4 post. Also one 1/4 mile W from NE
corner of Sec 31 in said town on line
between Sec 30 & 31. Said right of ways
was settled for as follows: Said highway
laid out to the width of 3 rods.
To Theodore Fons for S side of S1/2 of
SE1/4 of Sec 29 - $15.00
To Sylvester Knetter for S side of S1/2
of SW1/4 of Sec 29 - $15.00
To Martin Filtskowski for N side of
N1/2 of NW12 Sec 32 - $15.00
To Theodore Fons for N side of NW14
of NE114 of Sec 32 - $7.50
Awarded Joe Nowak for N side of
NE114 of NE1/4 of Sec 32 - $15.00
To Frank Knetter for S side of SE1/4 of
SE114 of Sec 30 - $7.50
To Frank Knetter for N side of NE114
of NE14 of Sec 31 - $7.50
The above is all paid and releases
signed for same
July 9, 1898 - Commencing from the
railroad track between Sec 9 & 10 in said
town running N on section line to the
Marathon City and Edgar road was duly
laid out. Riteway settled and paid for as
follows:
To Frank Krause on E side of Sec 4 -
$10.00
To John Seubert from railroad track
NW side of Sec 4 & 10 - $15.00
December 16, 1898 - Commencing
at 14 post on section line bewteen Sec 27
& 34 running N 1/4 mile. Settled for rite-
way and settled as follows:
To John Koller occupant of SE1/4 of
SW1/4 Sec 27 - $15.00
To Charles Deininger occupant of
SW1/4 of SE1/4 Sec 27 - $15.00
March 17, 1899 - Commencing at
1/4 post on the S side of Sec 6 thence
running N on 1/4 line 120 rods and that
Town of Cassel take charge and keep in
repair the balance of said road up to the
town line between Town of Cassel and
Town of Rib Falls.
July 13, 1899 - On above date the
town board gave out a job for building
piers for a bridge according to time set by
notice and lowest bidder took job and
gave bonds which are filed in Town Clerks
office. The bridge is located between Sec
3 &4T28, R5E
June 16, 1899 - Commencing on
section corners No. 4, 5 and 8, 9 running
from said corner S1/2 mile to middle of
Sec 8 & 9
July 8, 1899 - Commencing on the
SE corner of SW1/4 of Sec 23 at the 1/4
stake between Sec 23 and 26 thence
running due E for one mile to the middle
of sections 24 & 25.
Commencing on the corner between
sections 23, 24, 25 and 26 thence running
S to said N eight post between Sec 25 &
26.
Commencing between Sec 27 and 22
running on the 1/4 line N 1/4 mile.
Commencing at the eight post between
Sec 29 and 20 running W 1/4 mile to the
1/4 post between Sec 20 & 29
June 24, 1901 - Commencing at the
center post of Sec 6 thence running N 1/2
mile on the quarter line of Sec 6 to the
town line. Town board settled with Frank
Sudtke for riteway for $10.00
June 29, 1901 - Commencing at the
center post between Sec 3 & 4 thence
running E one mile on the 1/4 line to the
center post of Sec 2 & 3. The town board
settled for riteways land for above road
located on -
John Seubert 1/2 mile - $7.50
Peter Henke 1/2 mile - $25.00
Sebastian Hoesle 1/2 mile - $1.00
Adam Mucha 1/2 mile - $15.00
Commencing at the center post
between Sec 3 & 4 thence running W 1/4
mile on the 1/4 line eight post of Sec 4,
settled with John Duerstein 1/4 mile -
$3.00
September 10, 1901 - Commencing
at sections corners 17, 18, 19 & 20 thence
running one mile due N between Sec 17
& 18 to Sec 7 & 8. Damages were
awarded and paid as follows:
Conrad King 3/4 mile - $40.00
Anton King 1/4 mile - $10.00
Albert Young 1/4 mile - $10.00
Rebecca Young 1/4 mile - $20.00
Wm Young 1/2 mile - $25.00
A highway beginning at the S end of
the 1/4 line of Sec 15 thence running one
mile N on the quarter line of Sec 15.
Damages awarded and paid as follows:
Theodore Wadinski 1/4 mile - $12.50
Paul Starzinski 1/4 mile - $14.00
Adam Nowak 1/4 mile - $12.50
Joseph Adamski 1/4 mile - $12.50
St Wadinski 1/8 mile - $6.25
Andrew Pospychala 1/8 mile - $6.25
Martin Skrypchak 1/8 mile - $6.25
JB Nowak 1/8 mile - $6.25
Valentine Wilikowski 1/2 mile on 1/4
line of Sec 2 - $30.00
Joseph Wilichowski 1/2 mile on 1/4 line
of Sec 2 - $25.00
Ludwig Bredow 1/4 mile on 1/4 line of
Sec 6 - $10.00
John Starzinski 1/2 mile - $25.00
Joseph Adamski 1/2 mile - $7.25
St Wadinski 1/2 mile - $8.00
John Werner 3/4 mile - $37.50
Joseph Ueberlacker 1/2 mile - $25.00
May 10, 1902 - A highway beginning
at the quarter post between Sec 22 and 15
thence running S on 1/4 line of Sec 22 1/2
mile to center post of Sec 22. Said high-


Go up to Top of Page