Page View
Town of Cassel centennial
(1891-1991)
Roads and bridges, pp. 58-63
Page 60
pike & to do a filling for approchment to bridge according to contract for the sum of $40.00. To Fr Knetter to straighten creek for the sum of $2.00. To Charlie Wenzel to do a filling and build a bridge according to contract for the sum of $29.00. It was agreed and settled with Anton Henke occupant of the SW1/4 of SW14 of Sec 24, T 28, R 5 E for right of way for highway on W side of above described land for the sum of $15.00 (release signed) It was agreed and settled with Martin Calimika occupant of the SE1!4 of SE1/4 of Sec 23, T28, R5E for right of way for high- way on E side of the above described land for the sum of $15.00 (release signed) Job let to A Henke aned Calimika to ditch about 10 rods and make a track 1/4 mile between their land for $20.00 (each $10.00) according to the order of the board. Job let to Mathias Wagner to build a bridge across a creek in on said Mathias Wagner's road in Sec 14 for the sum of $34.00, to be paid for off taxes of 1897. June 16, 1897 - It is hereby agreed and understood between the Town of Cassel and Mathias Wagner of said town that a certain strip of land 1 and 80/100 acres situated on the line between the NW14 and the NE1/4 of the NE1/4 of Sec 14 in said Town of Cassel has hereby been leased to the Town of Cassel for a public highway for 99 years for all reasons what- soever for the sum of $1.00 to him in kind paid. September 20, 1897 - A road com- mencing at the SW corner of Sec 10 running straight N on line between Sec 9 & 10 in said Town of Cassel, said highway being laid out to the width of 3 rods and riteway settled for as follows: To St Wadinski for W side of Sec SW SW Sec 10 - $5.00 To Ron Wadinski for W side of NW SW of Sec 10 - $5.00 Awarded for W side of NW1/4 - 1/2 mile - $2.00 Settled with John Seubert on E side of Sec 9 - 1 mile - $1.00 A road commencing at the NW corner of Sec 15, T28, R5E running straight W 1/2 mile on line between Sec 9 & 16 to 1/4 post. Also one 1/4 mile W from NE corner of Sec 31 in said town on line between Sec 30 & 31. Said right of ways was settled for as follows: Said highway laid out to the width of 3 rods. To Theodore Fons for S side of S1/2 of SE1/4 of Sec 29 - $15.00 To Sylvester Knetter for S side of S1/2 of SW1/4 of Sec 29 - $15.00 To Martin Filtskowski for N side of N1/2 of NW12 Sec 32 - $15.00 To Theodore Fons for N side of NW14 of NE114 of Sec 32 - $7.50 Awarded Joe Nowak for N side of NE114 of NE1/4 of Sec 32 - $15.00 To Frank Knetter for S side of SE1/4 of SE114 of Sec 30 - $7.50 To Frank Knetter for N side of NE114 of NE14 of Sec 31 - $7.50 The above is all paid and releases signed for same July 9, 1898 - Commencing from the railroad track between Sec 9 & 10 in said town running N on section line to the Marathon City and Edgar road was duly laid out. Riteway settled and paid for as follows: To Frank Krause on E side of Sec 4 - $10.00 To John Seubert from railroad track NW side of Sec 4 & 10 - $15.00 December 16, 1898 - Commencing at 14 post on section line bewteen Sec 27 & 34 running N 1/4 mile. Settled for rite- way and settled as follows: To John Koller occupant of SE1/4 of SW1/4 Sec 27 - $15.00 To Charles Deininger occupant of SW1/4 of SE1/4 Sec 27 - $15.00 March 17, 1899 - Commencing at 1/4 post on the S side of Sec 6 thence running N on 1/4 line 120 rods and that Town of Cassel take charge and keep in repair the balance of said road up to the town line between Town of Cassel and Town of Rib Falls. July 13, 1899 - On above date the town board gave out a job for building piers for a bridge according to time set by notice and lowest bidder took job and gave bonds which are filed in Town Clerks office. The bridge is located between Sec 3 &4T28, R5E June 16, 1899 - Commencing on section corners No. 4, 5 and 8, 9 running from said corner S1/2 mile to middle of Sec 8 & 9 July 8, 1899 - Commencing on the SE corner of SW1/4 of Sec 23 at the 1/4 stake between Sec 23 and 26 thence running due E for one mile to the middle of sections 24 & 25. Commencing on the corner between sections 23, 24, 25 and 26 thence running S to said N eight post between Sec 25 & 26. Commencing between Sec 27 and 22 running on the 1/4 line N 1/4 mile. Commencing at the eight post between Sec 29 and 20 running W 1/4 mile to the 1/4 post between Sec 20 & 29 June 24, 1901 - Commencing at the center post of Sec 6 thence running N 1/2 mile on the quarter line of Sec 6 to the town line. Town board settled with Frank Sudtke for riteway for $10.00 June 29, 1901 - Commencing at the center post between Sec 3 & 4 thence running E one mile on the 1/4 line to the center post of Sec 2 & 3. The town board settled for riteways land for above road located on - John Seubert 1/2 mile - $7.50 Peter Henke 1/2 mile - $25.00 Sebastian Hoesle 1/2 mile - $1.00 Adam Mucha 1/2 mile - $15.00 Commencing at the center post between Sec 3 & 4 thence running W 1/4 mile on the 1/4 line eight post of Sec 4, settled with John Duerstein 1/4 mile - $3.00 September 10, 1901 - Commencing at sections corners 17, 18, 19 & 20 thence running one mile due N between Sec 17 & 18 to Sec 7 & 8. Damages were awarded and paid as follows: Conrad King 3/4 mile - $40.00 Anton King 1/4 mile - $10.00 Albert Young 1/4 mile - $10.00 Rebecca Young 1/4 mile - $20.00 Wm Young 1/2 mile - $25.00 A highway beginning at the S end of the 1/4 line of Sec 15 thence running one mile N on the quarter line of Sec 15. Damages awarded and paid as follows: Theodore Wadinski 1/4 mile - $12.50 Paul Starzinski 1/4 mile - $14.00 Adam Nowak 1/4 mile - $12.50 Joseph Adamski 1/4 mile - $12.50 St Wadinski 1/8 mile - $6.25 Andrew Pospychala 1/8 mile - $6.25 Martin Skrypchak 1/8 mile - $6.25 JB Nowak 1/8 mile - $6.25 Valentine Wilikowski 1/2 mile on 1/4 line of Sec 2 - $30.00 Joseph Wilichowski 1/2 mile on 1/4 line of Sec 2 - $25.00 Ludwig Bredow 1/4 mile on 1/4 line of Sec 6 - $10.00 John Starzinski 1/2 mile - $25.00 Joseph Adamski 1/2 mile - $7.25 St Wadinski 1/2 mile - $8.00 John Werner 3/4 mile - $37.50 Joseph Ueberlacker 1/2 mile - $25.00 May 10, 1902 - A highway beginning at the quarter post between Sec 22 and 15 thence running S on 1/4 line of Sec 22 1/2 mile to center post of Sec 22. Said high-
This material may be protected by copyright law (Title 17, US Code).| For information on re-use see: http://digital.library.wisc.edu/1711.dl/Copyright