University of Wisconsin Digital Collections
Link to University of Wisconsin Digital Collections
Link to University of Wisconsin Digital Collections
Ecology and Natural Resources Collection

Page View

Brasino, John Sheldon / A simple stochastic model predicting conservative mass transport through the unsaturated zone into ground water
[DNR-001] (c1986)

Appendix J: Results from Giford plot 1985 bromide sprayed at .779 mg/cm² on 5/21/85,   pp. 216-222 PDF (2.8 MB)


Page 216

216
Append ix J
Results from Giford plot 1985
Bromide sprayed at .779 mg/cm2 on 5/21/85
Definitions and Methods
Dags
Days after bromide was applied. The sample period is the value of Days
minus the previous value of Days.
52,54...
The bromide in parts per million found in the solution collected from soil
water sampler number 52, or 54,etc.
For all other information refer to Appendix F
Data collected at 3 feet
Bromide in ppm
DAYS    52
14
28
35
42
49
56
63
70
77
88
0.48
0.24
0.16
0.24
1.12
5.76
10.32
15.28
17.84
19.52
54     56
0.64
0.32
1.36
0.88
0.08
0.8
0.72
1.04
0.56
0.64
0.48
0.32
0.08
0.24
0.08
0.32
0.24
0.4
0.56
0.96
58
0.64
0.32
0.16
0.24
0.24
0
1.52
3.68
4
4.08
60
0.48
0.4
1.36
3.84
6.88
15.3
26
34.5
26.5
19.1
62
0.32
0.16
0.08
0.08
0.24
1.36
2.8
4.96
4.08
5.28


Go up to Top of Page