Holt Hardwood Co.
|
|
|
Site Plan for Fire Insurance Rating, 1954 October 26 Blueline, 1 sheet
|
|
|
Side Elevation with End Elevation Pencil, 1 sheet
|
|
|
Side Elevation, Boiler Vault, drawn by D.S. DeWitt, 1938 May Ink original, 1 sheet
|
|
|
Elevation (?) Ink original, 1 sheet
|
|
|
Rough Drawings for Covered Passageway, 1962, September 5 Reprographic reproduction, 1 sheet
|
|
|
Presentation Drawings, Boiler House Repairs, 1948 August 24 Blueprint, 4 sheets : Presentation Drawings, Boiler House Repairs, Floor plans and details, Elevations and sections, Wall sections and details, Framing plans, with Contract Specifications, by John E. Somerville, Architect, Green Bay.
|
|
|
Roof Structural Specifications and Diagrams, Boiler Room Repairs, by Northeastern Boiler and Welding, Ltd., Green Bay, 1948 September 28 Blueprint, 4 sheets
|
|
|
Reference Drawing, Boiler Vault, by Wickes Boiler Co., Saginaw, Michigan Blueprint, 1 sheet
|
|
|
Floor Plan, Mill(?) Foundation, with Equipment Ink original, 1 sheet
|
|
|
Foundation Plans, Power Plant, with Equipment Ink original, 1 sheet
|
|
|
Plan of Mill Office Blueprint, 1 sheet
|
|
|
Floor Plan, Main Building Ink original, 1 sheet
|
|
|
Plan of Broom Handle Plant Mylar, 1 sheet
|
|
|
Plan of Store and Lunch Room and Employee Rest Rooms and Showers, Broom Handle Plant Ink original, 1 sheet
|
|
|
Plan of North Drying Kilns Ink original, 1 sheet
|
|
|
Section Drawing of North Drying Kilns Ink original, 1 sheet
|
|
|
Floor Plan of Yates Band Rip Saw, 1924 June 7 Mylar, 1 sheet
|
|
|
Leitelt Iron Works, Grand Rapids, Michigan
|
|
|
Section, Limit Switch Connection, 1923 June 6(?) (W-3) Blueprint, 1 sheet
|
|
|
Section, Leitelt Lumber Lift (S-3) Blueprint, 1 sheet
|
|
|
Section, Leitelt Lumber Lift, 1924 June 4 Blueprint, 1 sheet
|
|
|
Detail, Plan Assembly, 1923 March 22 (6L-P) Blueprint, 1 sheet
|
|
|
Detail, Wiring Diagram, 1922 October 21 (W1) Blueprint, 1 sheet
|
|
|
Detail, Assembly Drawing, 1922 December 30 (6L) Blueprint, 1 sheet
|
|
|
Instructions for Installation and Letter
|
|
|
Transverse Section of Building (showing windows, studding, trusses) Mylar, 1 sheet
|
|
|
Mechanical Section, Boiler, by the Engineer Co., New York, New York, 1938 November 28 1 sheet
|
|
|
Specification Drawings, Steel for Building #22-23, 1918 July 19, or 1924 May 31, by Four Wheel Drive Auto Co., Clintonville, Wisconsin Blueprint, 1 sheet
|
|
|
Roof Truss Diagram, 1924 May Mylar, 1 sheet
|
|
|
Engineering Drawings and Calculations for Roof 2 sheets
|
|
|
Engineering and Mechanical Construction Drawings for bidding for the Unipulvo Boiler System, Strong-Scott Manufacturing Co., 1929-1936 Blueprint, 6 sheets
|
|
|
Mechanical Drawings for Sawdust Equipment, including Engine Foundation Plans, 1949 April 4; and Boiler and Engine Room Piping, , 1949 April 14, by Robbins Flooring Co., Reed City, Michigan Blueprint, 2 sheets
|
|
|
Construction Drawings for bidding for an Electric Light Plant, City of Portland, Indiana, by Babcock and Wilcox Co., New York, 1913 March 5, Blueprint, 4 sheets
|
|
|
Working Drawings for Large Cyclone Collector on Boiler Vault, by Ajax Tank and Tower Co., Chicago, 1925 Blueprint, 5 sheets
|
|
|
Working Drawings, Permutit Water Purification Plant, Permutit Co., New York, New York, 1928 January 10, Blueprint, 1 sheet
|
|
|
Diagram, Union Boiler controls, 1948 January 2 Blueprint, 1 sheet
|
|
|
Diagram, Diesel 440-V Switchboard, 1946 October 8 Blueprint, 1 sheet
|
|
|
Diagram, Switchboard, rear view Ink original, 1 sheet
|
|
|
Wiring Diagram, 1940 July 1 Colored pencil over blueprint, 1 sheet
|
|