University of Wisconsin Digital Collections
Link to University of Wisconsin Digital Collections
Link to University of Wisconsin Digital Collections
The University of Wisconsin Collection

Page View

Matthias, F. T. (ed.) / The Wisconsin engineer
Volume 33, Number VI (March 1929)

Morrison, L. W.
Engineering review,   pp. 212-III


Page 213


213
MThe WISCONSIN ENGINEER
cc   !i;  "c c c r
' Céi  7 1 3 / ow.  7  _
yCC. v// Io
Anothe  fa~    ~hsosrcin.w~h
speed and adaptability of the Koehring Crane
in setting the piling. The last pile was sunk
four days ahead of the specified schedule. The
entire contract was completed and accepted one
day before the time limit.
Again a Koehring product is identified with the
successful completion of an unusual project!
   KOEHRING COMPANY
        MILWAUKEE, WISCONSIN
             Manufacturers of
Pavers, Mixers - Gasoline Shovels, Cranes and Draglines
Please mention The Wisconsin Engineer when you write
-      *          - U
MARCH, 1929


Go up to Top of Page