Page View
Foth and Van Dyke and Associates, Inc. / Environmental impact report for the Crandon project
Volume IIIa (1998)
2: Project description, pp. 2-14
PDF (4.5 MB)
Page 2
2 Project Description 2.1 Location As shown on Figure 1-1, beginning at the intersection of the site access road and STH 55, the pipeline is proposed to be routed along and buried within the right-of-way (ROW) of federal, state, county and locally designated public roads with the exception of a short segment along the Wisconsin River, where the pipeline will parallel the river on Wisconsin Public Service Corporation (WPSC) property from Hat Rapids Road north to the Hat Rapids Dam. The proposed pipeline route begins at the CMC project site wastewater treatment facility and follows the proposed plant site access road to STH 55. The route then follows STH 55 north to County Trunk Highway (CTH) S, continuing north to United States Route (USR) 8. The proposed route will follow USR 8 to Rhinelander where it will head south along STH 17 to Hat Rapids Road. The route will follow Hat Rapids Road to the Wisconsin River, turn north and proceed to the Hat Rapids Dam. The total length of the proposed pipeline is approximately 38.3 miles. The Hat Rapids Dam is owned and operated by WPSC. Table 2-1 provides specific information regarding the location of the proposed pipeline. As shown in Table 2-1, the pipeline will be routed on the west side of STH 55 and CTH S; to the north of USR 8 from CTH S to CTH V along an existing snowmobile trail; to the south of USR 8 between CTH V and River Bend Road; to the north of the Rhinelander Beltline; to the west of STH 17; and to the south of Hat Rapids Road. Per discussions with the Wisconsin Department of Transportation (WisDOT), the pipeline will be placed 25 feet from the edge of pavement along STH 55, STH 17 and all of USR 8, with the exception of the portion along the snowmobile trail. The pipeline will be installed down the centerline of the snowmobile trail. At the recommendation of the Forest County Highway Commission, the pipeline will be installed along the west top-of-ditch line (this varies but averages approximately 25 feet from the edge of pavement) on CTH S. Due to the narrow ROW, the pipeline will be installed at the edge of pavement on Hat Rapids Road. At the Wisconsin River, the pipeline will parallel the river on the east bank north to the Hat Rapids Dam on property owned by WPSC. MKJ\MLD2\93CO49\R-WIRIWW\10000 Wisconsin River Wastewater Discharge Pipeline September 12, 1995 Foth & Van Dyke e 2
This material may be protected by copyright law (e.g. Title 17, US Code).| For information on re-use see: http://digital.library.wisc.edu/1711.dl/Copyright




