University of Wisconsin Digital Collections
Link to University of Wisconsin Digital Collections
Link to University of Wisconsin Digital Collections
Ecology and Natural Resources Collection

Browse subcollection Crandon Mine Reports

252 matches.


Exxon Minerals Company Crandon Project: air quality permit application report: Notice of Intent (NOI) (1985)

Exxon Minerals Company Crandon Project: air quality permit application report: Notice of Intent (NOI) (1985)

Exxon Minerals Company Crandon Project: mining permit application: Volume I (1986)

Exxon Minerals Company Crandon Project: mining permit application: Volume II (1986)

Exxon Minerals Company Crandon Project: NR 182.08 revised feasibility report, mine waste disposal facility (1985)

Exxon Minerals Company Crandon Project: revised air quality permit application report: Notice of Intent (NOI) (1985)

Exxon Minerals Company Crandon Project: revised air quality permit application report: Notice of Intent (NOI) (1985)

Exxon Minerals Company Crandon Project: revised air quality permit application report: Notice of Intent (NOI) (1985)

Exxon Minerals Company Crandon Project: revised air quality permit application report: Notice of Intent (NOI) (1985)

Exxon Minerals Company Crandon Project: revised air quality permit application report: Notice of Intent (NOI) (1985)

Exxon Minerals Company Crandon Project: revised air quality permit application report: Notice of Intent (NOI) (1985)

Exxon Minerals Company High capacity well approval application: Crandon Project: Volume I (1985)

Exxon Minerals Company High capacity well approval application: Crandon Project: Volume II (1986)

Exxon Minerals Company Mine refuse disposal facility: feasibility report (1985)

Exxon Minerals Company Revised Environmental Impact Report: Crandon Project: Volume I. Chapter 1.0: Sections 1.1 thru 1.5 ([1985])

Exxon Minerals Company Revised Environmental Impact Report: Crandon Project: Volume II. Chapter 2.0: Sections 2.1 thru 2.5 ([1985])

Exxon Minerals Company Revised Environmental Impact Report: Crandon Project: Volume III. Chapter 2.0: Sections 2.6 thru 2.10 ([1985])

Exxon Minerals Company Revised Environmental Impact Report: Crandon Project: Volume IV. Chapter 3.0: Sections 3.1 thru 3.7, Chapter 4.0: Sections 4.1 thru 4.4 ([1985])

Exxon Minerals Company Revised Environmental Impact Report: Crandon Project: Volume V. Exhibit A and Appendices 1.1A and 3.4A ([1985])

Exxon Minerals Company Revised Environmental Impact Report: Crandon Project: Volume VI. Appendices 2.1A thru 2.2B ([1985])

Exxon Minerals Company Revised Environmental Impact Report: Crandon Project: Volume VII. Appendices 2.3A thru 2.4J ([1985])

Exxon Minerals Company Revised Environmental Impact Report: Crandon Project: Volume VIII. Appendices 2.4K thru 2.5D ([1985])

Exxon Minerals Company Revised Environmental Impact Report: Crandon Project: Volume IX. Appendices 2.5E thru 2.6E, 2.8 and 2.10A ([1985])

Exxon Minerals Company Revised Environmental Impact Report: Crandon Project: Volume X. Appendix 4.1A ([1985])

Exxon Minerals Company Wisconsin pollutant discharge elimination system (WPDES) : wastewater discharge permit application, Crandon Project (1985)

Foley and Lardner Wis. stats. 293.50 compliance demonstration: Volume I (1998)

Foley and Lardner Wis. stats. 293.50 compliance demonstration: Volume II (1998)

Foley and Lardner Wis. stats. 293.50 supplemental compliance demonstration report (Sacaton Mine, Pinal Co., AZ) (2003)

Foth and Van Dyke and Associates, Inc. Addendum no. 1 to the mine permit application: reflooded mine management plan: prepared for Nicolet Minerals Company (2000)

Foth and Van Dyke and Associates, Inc. Addendum no. 5 to the May 1995 Crandon Project tailings management area feasibility report/plan of operation : prepared for Nicolet Minerals Company (1998)

Foth and Van Dyke and Associates, Inc. Addendum no. 6 to the May 1995 Crandon Project tailings management area feasibility report/plan of operation : prepared for Nicolet Minerals Company (1999)

Foth and Van Dyke and Associates, Inc. Air pollution control permit application (1995)

Foth and Van Dyke and Associates, Inc. Air pollution control permit application (1998)

Foth and Van Dyke and Associates, Inc. Crandon Project addendum no. 1 to the preliminary engineering report for wastewater treatment facilities: mine water management contingency plan: scope ID 00C002 (2000)

Foth and Van Dyke and Associates, Inc. Crandon Project section 404 permit application : addendum 1 (1998)

Foth and Van Dyke and Associates, Inc. Crandon Project surface water mitigation plan (1998)

Foth and Van Dyke and Associates, Inc. Environmental Impact Report for the Crandon Project: Volume I (1995)

Foth and Van Dyke and Associates, Inc. Environmental Impact Report for the Crandon Project: Volume II (1995)

Foth and Van Dyke and Associates, Inc. Environmental Impact Report for the Crandon Project: Volume IIIb (1997)

Foth and Van Dyke and Associates, Inc. Environmental Impact Report for the Crandon Project: Volume I (1998)

Foth and Van Dyke and Associates, Inc. Environmental Impact Report for the Crandon Project: Volume II (1998)

Foth and Van Dyke and Associates, Inc. Environmental Impact Report for the Crandon Project: Volume IIa (1998)

Foth and Van Dyke and Associates, Inc. Environmental Impact Report for the Crandon Project: Volume III (1998)

Foth and Van Dyke and Associates, Inc. Environmental Impact Report for the Crandon Project: Volume IIIa (1998)

Foth and Van Dyke and Associates, Inc. Environmental Impact Report for the Crandon Project: Volume IV (1998)

Foth and Van Dyke and Associates, Inc. Environmental Impact Report for the Crandon Project: Volume V (1998)

Foth and Van Dyke and Associates, Inc. Environmental Impact Report for the Crandon Project: Volume VI (1998)

Foth and Van Dyke and Associates, Inc. Environmental Impact Report for the Crandon Project: Volume VII (1998)

Foth and Van Dyke and Associates, Inc. Environmental Impact Report for the Crandon Project: Volume VIII (1998)

Foth and Van Dyke and Associates, Inc. Environmental Impact Report for the Crandon Project: Volume IX (1998)

Foth and Van Dyke and Associates, Inc. Environmental Impact Report for the Crandon Project: Volume X (1998)

Foth and Van Dyke and Associates, Inc. Environmental Impact Report for the Crandon Project: Volume Xa (1998)

Foth and Van Dyke and Associates, Inc. Environmental Impact Report for the Crandon Project: Volume Xb (1998)

Foth and Van Dyke and Associates, Inc. Environmental Impact Report for the Crandon Project: Volume XI (1998)

Foth and Van Dyke and Associates, Inc. Environmental Impact Report for the Crandon Project: Volume XII (1998)

Foth and Van Dyke and Associates, Inc. Environmental Impact Report for the Crandon Project: Volume XIII (1998)

Foth and Van Dyke and Associates, Inc. Environmental Impact Report for the Crandon Project: Volume XIV (1998)

Foth and Van Dyke and Associates, Inc. Environmental Impact Report. Volume XV, Crandon Project soil absorption system supplemental data report: prepared for Nicolet Minerals Company: Volume XV (1999)

Foth and Van Dyke and Associates, Inc. Geosynthetic material decision matrices for Crandon Project containment facilities (1997)

Foth and Van Dyke and Associates, Inc. High capacity well permit application (1995)

Foth and Van Dyke and Associates, Inc. High capacity well permit application for the Crandon Project (1998)

Foth and Van Dyke and Associates, Inc. High capacity well permit application, addendum no. 1 (1997)

Foth and Van Dyke and Associates, Inc. Mine permit application for the Crandon Project, 93C049 (1995)

Foth and Van Dyke and Associates, Inc. Mine permit application for the Crandon Project, 93C049 (1998)

Foth and Van Dyke and Associates, Inc. Notice of intent for storm water discharges (1995)

Foth and Van Dyke and Associates, Inc. Notice of intent for storm water discharges associated with construction activities under a general WPDES permit (1998)

Foth and Van Dyke and Associates, Inc. Notification of intent to collect data and a detailed scope of study for the proposed Crandon Project, Crandon, Wisconsin (1994)

Foth and Van Dyke and Associates, Inc. Preliminary engineering report for wastewater treatment facilities (1995)

Foth and Van Dyke and Associates, Inc. Preliminary engineering report for wastewater treatment facilities for the Crandon Project: scope ID 93C049 (1998)

Foth and Van Dyke and Associates, Inc. Section 404 permit application (1995)

Foth and Van Dyke and Associates, Inc. Summary, project description and environmental baseline data for the proposed Crandon Project, Crandon, Wisconsin (1995)

Foth and Van Dyke and Associates, Inc. Tailings management area feasibility report, plan of operation for the Crandon Project, 93C049 (1995)

Foth and Van Dyke and Associates, Inc. Tailings management area feasibility report, plan of operation for the Crandon Project, 93C049 (1995)

Foth and Van Dyke and Associates, Inc. Tailings management area feasibility report, plan of operation for the Crandon Project, 93C049 (1995)

Foth and Van Dyke and Associates, Inc. Tailings management area feasibility report, plan of operation for the Crandon Project, 93C049 (1995)

Foth and Van Dyke and Associates, Inc. Waste characterization update report (1995)

Foth and Van Dyke and Associates, Inc. Water regulatory permit application : wetland compensation site (1995)

Foth and Van Dyke and Associates, Inc. Water regulatory permit application for the proposed Crandon Project mine site (1998)

Foth and Van Dyke and Associates, Inc. Water regulatory permit application: mine site and treated wastewater discharge pipeline, Crandon Project, Crandon, Wisconsin (1996)

Foth and Van Dyke and Associates, Inc. WPDES permit application (1995)

Foth and Van Dyke and Associates, Inc. WPDES permit application for the Crandon Project (1998)

Gedicks, Al What you should know about Exxon/Rio Alcom's proposed mine at Crandon/Mole Lake (1996)

Martin, Ronald; Schmidt, James; Schuettpelz, Duane; Water Quality Evaluation Section of the Wisconsin Department of Natural Resources Water quality criteria for Swamp Creek and water quality related effluent limitations for the Exxon Minerals Company ([date unknown])

Rowe, Roger G. Supergene weathering at Crandon deposit (1982)

Securities and Exchange Commission Form 10-K: Annual report pursuant to Section 13 of the Securities Exchange Act of 1934. For the year ended December 31, 1981 (1981)

Voorhees, Michael L.; Prickett, Thomas A. Ground water inflow model for the proposed Crandon mine (1982)

Wisconsin Bureau of Integrated Science Services Status report on the review of the proposed Crandon mine: July 2001 (2001)

Wisconsin Department of Natural Resources Draft Environmental Impact Statement, Exxon Minerals Company zinc-copper mine, Crandon, Wisconsin ([1986])

Wisconsin Department of Natural Resources Final Environmental Impact Statement. Exxon Coal and Minerals Co. zinc-copper mine, Crandon, Wisconsin ([1986])

Wisconsin Department of Natural Resources Progress report on the Department's review of the mine proposed by the Crandon Mining Company (1997)

Wisconsin Department of Natural Resources Progress report on the Department's review of the mine proposed by the Crandon Mining Company (1997)

Wisconsin Department of Natural Resources Progress report on the Department's review of the mine proposed by the Crandon Mining Company (1997)

Wisconsin Department of Natural Resources Public concerns regarding the proposed Crandon mine and DNR responses: a summary of public comments and questions from the April 28, 1997 public meeting at the town of Ainsworth, Wisconsin with DNR responses (1997)

Wisconsin Department of Natural Resources Public concerns regarding the proposed Crandon mine and DNR responses: a summary of public comments and questions from the May 14, 1997 public meeting at Crandon, Wisconsin, with DNR responses (1997)

Wisconsin Department of Natural Resources Public concerns regarding the proposed Crandon mine and DNR responses: a summary of public comments and questions from the May 28, 1997 public meeting at Wausau, Wisconsin, with DNR responses (1997)

Wisconsin Department of Natural Resources Public concerns regarding the proposed Crandon mine discharge into the Wisconsin River: a summary of public comments and questions from the May 20, 1996 public meeting at Tomahawk, Wisconsin, with DNR reponses (1996)

Wisconsin Department of Natural Resources Public concerns regarding the proposed Crandon mine: a summary of public comments and questions from the April 9, 1997 public meeting at New London, Wisconsin, with DNR responses (1997)

Wisconsin Department of Natural Resources Public concerns regarding the proposed Crandon mine: a summary of public comments and questions from the July 31, 1997 public meeting at Rhinelander, Wisconsin, with DNR responses (1997)

Wisconsin Department of Natural Resources Report on the progress of the Department's review of the proposed Crandon mine and other mining issues (1998)

Wisconsin Department of Natural Resources Report on the progress of the Department's review of the proposed Crandon mine and other mining issues (1998)

Wisconsin Department of Natural Resources Status report on the review of the Crandon mine: April 1999 (1999)

U. S. Army Corps of Engineers Crandon mine project Environmental Impact Statement draft scoping document (2001)

Addendum no. 1 Geotechnical review: Crandon Project waste disposal system (1982)

Addendum to archaeological inventory and evaluation at Exxon Minerals Company, Crandon Project site in Forest County and Langlade County, Wisconsin: proposed water dischage pipeline corridor (1983)

Air pollution control permit application for the Kennecott Flambeau Project (1989)

Application for water regulatory permits and approvals for the Kennecott Flambeau Project (1989)

Aquatic biology of Swamp Creek for the Crandon Project January-December 1983 (1984)

Archaeological inventory and evaluation at Exxon Minerals Company, Crandon Project site in Forest County and Langlade County, Wisconsin (1982)

[Bedrock permeability] ([date unknown])

Bentonite-amended soil liner usage in solid waste disposal facilities: case histories (1984)

[Crandon Mine Project environmental assessment report] ([date unknown])

Chemistry and hydrology in Swamp Creek, 1983 (1984)

Colorado School of Mines Research Institute: study on characterization of Crandon mill tailings (1982)

Crandon Mining Company responses to selected Wisconsin Department of Natural Resources July 31, 1995 comments on the Crandon Mining Company Environmental Impact Report (1995)

Crandon Project comments volume 1 ([date unknown])

Crandon Project comments volume 2 ([date unknown])

Crandon Project comments volume 3 ([date unknown])

Crandon Project comments volume 4 ([date unknown])

Metallic Mining Council Rhinelander Meeting, May 29, 1979 (1979)

The Crandon Project: progress report (1980)

Exxon Minerals Company Crandon Project mine/mill surface facility: site master plan ([1983])

Crandon Project: direct testimony of Exxon witnesses, volume 1 ([198-])

Crandon Project: direct testimony of Exxon witnesses, volume 2 ([198-])

Crandon Project: direct testimony of Exxon witnesses, volume 3 ([198-])

Exxon Minerals Company Crandon: the quest and the questions ([1979])

Draft environmental Impact Statement, Exxon Minerals Company zinc-copper mine, Crandon, Wisconsin (1986)

Draft study plan: socioeconomic assessment (1979)

EIR chapter 1: construction of waste disposal facilities (1982)

EIR Volume II chapter 2.0 sections 2.1 thru 2.5 (1985)

Environmenal Impact Report: Crandon Project MWDF feasability report ([date unknown])

Environmental Impact Report Crandon Project, volume 1: chapter 1.0 sections 1.1 thru 1.5 (1982)

Environmental Impact Report Crandon Project, volume 1: chapter 1.0 sections 1.1 thru 1.5 revised (1985)

Environmental Impact Report Crandon Project, volume 2: chapter 2.0 sections 2.1 thru 2.5 revised ([date unknown])

Environmental Impact Report Crandon Project, volume 3: chapter 2.0 sections 2.1 thru 2.5 ([date unknown])

Environmental Impact Report Crandon Project, volume 3: chapter 2.0 sections 2.1 thru 2.5 revised ([date unknown])

Environmental Impact Report Crandon Project, volume 4: chapter 3.0 sections 3.1 thru 3.5 revised ([date unknown])

Environmental Impact Report Crandon Project, volume IX (1982)

Environmental Impact Report Crandon Project, volume VI (1982)

Environmental Impact Report Crandon Project, volume VII (1982)

Environmental Impact Report Crandon Project, volume VIII (1982)

Environmental Impact Report Crandon Project, volume X (December 1985)

Environmental Impact Report for the Kennecott Flambeau Project: Volume I (1989)

Environmental Impact Report for the Kennecott Flambeau Project: Volume II (1989)

Environmental Impact Report for the Kennecott Flambeau Project: Volume III (1989)

Environmental Impact Report for the Kennecott Flambeau Project: Volume IV (1989)

Environmental Impact Report for the Kennecott Flambeau Project: Volume V (1989)

Environmental Impact Report for the Kennecott Flambeau Project: Volume VI (1989)

Environmental Impact Report: Crandon Project, volume 5 appendices 1.1a and 1.2a (1982)

Environmental Impact Report: Crandon Project, volume 6 appendices 2.1a and 2.2b ([date unknown])

Evaluation of prospective common liners: Crandon Project waste disposal system project report 6.2 (1981)

Evaluation of surface effects ([date unknown])

Excess water discharge: Crandon Project waste disposal system (1981)

Exxon Minerals Company Crandon Project: tailings storage facility report on conceptual design (1982)

Final Environmental Impact Statement Exxon Coal and Minerals Co. zinc-copper mine Crandon, Wisconsin (1986)

Final report Exxon Minerals Company: Exxon contracts No. 21562 preliminary engineering mine/mill railroad spur vol. I ([date unknown])

Final report Exxon Minerals Company: Exxon contracts No. 21562 preliminary engineering mine/mill railroad spur vol. II ([date unknown])

A final report: Exxon Minerals Company preliminary engineering mine/mill access road (alternate alignment) contract #21615 volume II (1982)

Final report: mine hydrology test data analysis (1982)

Final report: soil attenuation study, volume 1 ([date unknown])

Final report: soil attenuation study, volume II: appendix h, laboratory data ([date unknown])

Final report: water and sediment chemistry and hydrology in Swamp Creek for the Crandon Project (1983)

Forest inventory, timber appraisal, and forest management recommendations on 3,474 acres of the Crandon mine project (1982)

Geohydrologic characterization (1982)

Geotechnical review: Crandon Project waste disposal system: project report 2: volume 1 (1981)

Geotechnical review: Crandon Project waste disposal system: project report 2: volume 2 (1981)

Geotechnical review: Crandon Project waste disposal system: project report 2: volume 3 (1981)

Groundwater impact screening model: Crandon Project waste disposal system project: report 9 (1982)

Groundwater potentiometric contours: Crandon Project waste disposal system: project report 7 (1981)

Groundwater withdrawal permit application for the Kennecott Flambeau Project (1989)

Hydraulic relations between Little Sand, Oak, Duck, Skunk, and Deep Hole Lakes and the main ground water aquifer Crandon Project (1985)

Hydrodynamics and associated chemical species transport calculations performed in analysis of the Exxon/Crandon infiltration test site (1981)

Hydrogeologic study update for the Crandon Project, volume 1 ([1984])

Hydrogeologic study update for the Crandon Project, volume 2 ([1984])

Hydrological balance for selected wetlands (1982)

Investigation of feasibility of dewatering and other alternatives for open pit mine option, near Crandon, Wisconsin (1977)

Laboratory testing programs: Crandon Project waste disposal system project report 5 (1982)

Mining permit application for the Flambeau project volume 1 (1989)

Mining permit application for the Flambeau project volume 2 (1989)

Mining permit application for the Kennecott Flambeau Project (1989)

Misc. reports relating to Crandon Project (1978-1884)

Miscellaneous details and analyses: Crandon Project waste disposal system: project report 11 (1982)

Miscellaneous papers related to Crandon Project socioeconomic study ([date unknown])

Miscellaneous reports relating to the Crandon Project (1978-1985)

[Noise report] ([date unknown])

Parametric seepage rate estimages: Crandon Project waste disposal system project report 3.1 (1982)

Phase III water management study volume 1 ([date unknown])

Phase III water management study volume 2 ([date unknown])

Phase III water management study volume 3 ([date unknown])

Preliminary engineering report for wastewater treatment facilities for the Kennecott Flambeau Project (1989)

Preliminary engineering: mine/mill access road (alternate alignment): volume 1 (1982)

Preliminary socioeconomic impact analysis of Exxon's proposed Crandon Project (1985)

Pump test and analyses: Crandon Project waste disposal system project report 4 (1981)

Pyrite processing market studies: final report (1979)

Pyrite processing study: appendix (1980)

Pyrite processing study: phase 1: marketing, transportation, process technology (1979)

Pyrite processing study: summary (1981)

Radiological testing program (1981)

Results of geologic, geotechnical, and hydrologic investigations of a portion of the proposed exploration ramp, Crandon mine (1977)

Revised Wisconsin pollutant discharge elimination system (WPDES) : wastewater discharge permit application, Crandon Project (1985)

Socioeconomic assessment: analogous area methodology and report on case selection (1981)

Socioeconomic assessment: definition of the local study area (1980)

Socioeconomic assessment: economic analysis methodology (1982)

Socioeconomic assessment: fiscal analysis methodology (1981)

Socioeconomic assessment: forecast of future conditions (1983)

Socioeconomic assessment: forecast of future conditions: data summary (1983)

Socioeconomic assessment: housing and land use analysis methodology (1982)

Socioeconomic assessment: Native American communities analysis methodology (1980)

Socioeconomic assessment: public facilities and services analysis methodology (1981)

Socioeconomic assessment: report on current conditions (1981)

Socioeconomic assessment: sociocultural analysis methodology (1980)

Socioeconomic assessment: study plan (1980)

Socioeconomic assessment: survey research methodology (1980)

Soil report part I: proposed Flambeau project: Great Lakes Exploration Company, Ladysmith, Wisconsin ([1972])

Soil report part II: proposed Flambeau project: Great Lakes Exploration Company, Ladysmith, Wisconsin ([1972])

Supplemental wetlands assessment report (1983)

System development: Crandon Project waste disposal system: project report 8 (1983)

Tailings Pond reclamation cover: Crandon Project waste disposal system: project report 10 (1982)

Transportation of reagent materials off-site risk related issues (1984)

Water treatment facility: final plans and specifications (1986)

Wetlands assesment maps (1982)

Wetlands assessment appendix (1982)

Wetlands assessment inventory reports (1982)

Wetlands assessment report ([date unknown])

WPDES permit application for the Kennecott Flambeau Project (1989)

Wisconsin clay deposits (December 1979)

Addendum to Crandon Project: revised Wisconsin pollutant discharge elimination system wastewater discharge permit application (May 1986)

Report on underdrain review, Crandon Project waste disposal system: project report 3.2 (Marcy 1982)

Responses to DNR comments on mining permit application (November 11, 1983)

Responses to July 9, 1984 DNR comments on the noise reports (October 31, 1984)

[Letter to the Wisconsin Department of Natural Resources from Exxon Minerals Company about ground water modeling and mine dewatering impact analysis] (January 10, 1985)

Responses to DNR comment letter dated May 25, 1984 on the mining permit application ([1984])

February 29, 1984 meeting comments: [Crandon Project] (1984)

[Addendums to revised mining permit application] (May 1986)

July 11, 1983 DNR comments (1983)

Anderson, Mary P. Comments on D'Appolonia's flow model and hydrologic impact analysis of the Crandon site as documented in appendix 4.14A of the EIR (January 1984)

Attenuation characteristics of soils in the prospecting program infiltration site for Exxon Minerals Company ([date unknown])

Helmke, Philip A. Review of the mining and milling waste materials and interaction of the tailing leachate with the mine waste disposal facility liner and subsoils for a zinc-copper mine proposed by Exxon Corporation near Crandon, Wisconsin (December 7, 1984)

Golder Associates Report on Exxon Crandon pump test: response to DNR memorandum (October 1984)

Davy McKee Engineers and Constructors Crandon Project pyrite processing study, phase II : economics, capital costs, operating costs, revenues: 2489/02 (June 1981)

STS Consultants, Lts. Laboratory testing of tailings: (Exxon identification no. 21644): STS Job 12391 (1983)

[Miscellaneous Crandon Project correspondence] (1984-1985)

Hensen, Barry J. Responses to DNR comments on the revised EIR, DNR letter dated December 28, 1984 (April 12, 1985)

Trevino, Andres A. Review of the Crandon Project reports submitted by Exxon Minerals Company assessing possible uses for pyrite tailings : final report (December 1984)

Schuff, Richard G.; Rock, William T. Review of hydraulic relationship between site area lakes and the main groundwater aquifer, Crandon (November 8, 1984)

Gilmore, John S.; Hammond, Diane M.; Johnson, Joel F.; Uhlmann, Julie M. Review of existing socioeconomic information and definition of local study area for the proposed Exxon mine near Crandon, Wisconsin (April 23, 1984)

Mine Waste Reclamation Ltd. A preliminary study of requirements for plant growth on soils from the Crandon Project area (June 1982)

Wisconsin. Department of Natural Resources Preconstruction review and preliminary determination on the proposed construction, operation, and reclamation of an underground zinc copper lead mine ore processing mill and associated facilities for Exxon Minerals Company to be located five miles south of Crandon Forest County, Wisconsin: 85-SJK-003 (April 26, 1985)

Wible, Lyman F. [Letter to Exxon Minerals Company about groundwater standards, compliance boundaries, and contingency Plans for the Crandon Project, Forest County] (April 29, 1986)

Owen Ayres & Associates Waste disposal facility reclamation cap: Crandon Project water balance analysis (November 1982)

Responses to DNR comments on chapter 1 of the Environmental Impact Report ([date unknown])

Exxon Minerals Company Preliminary project description: Crandon Project (October 1980)

Crandon Mining Company The Crandon Project: summary update, mine plan and Environmental Impact Report (1996)


Go up to Top of Page