Contents
The Environmental Impact Statement procedure
Flambeau Mining Corporation copper mine Rusk County, Wisconsin, pp. i-ii
Table of contents, pp. iii-iv
Description of the environment and of the proposed action, pp. 1-98
Probable adverse and beneficial impacts on the environment, pp. 99-121
Alternatives to the proposed action, pp. 122-127
Probable adverse environmental effects which cannot be advoided, pp. 128-129
Irreversible and irretrievable commitment of resources if the project is implemented, pp. 131-132
Appendix A. Woody species within the open pit area, p. 133
Appendix B. Ferns and fern allies of the open pit area, p. 134
Appendix C. Larger mammals of project site, p. 135
Appendix D. Spring and summer bird sightings 1973, p. 136
Appendix E. Composite bird siting list, p. 137
Appendix F. Hypothetical species list of reptiles and amphibians, p. 138
Appendix G. Representative orders and families of insects found on the project site, p. 139
Appendix H. Fishes of the Flambeau River between Ladysmith and the Thornapple Dam, p. 140
Appendix I. Waste materials production schedule, p. 141
Appendix J. Disposition of waste materials, p. 142
Appendix K. Waste haul road - profile and sections, p. 143
Appendix L. Water budget, pp. 144-157
Appendix M. Noise level calculations, pp. 158-160
Appendix N. Basis for employment and population estimates, pp. 161 ff.